My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 03/24/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:44:13 PM
Creation date
4/8/2020 2:50:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.2 Utilities <br />3.2.a Watermain <br />A 16" CIP trunk water supply line was constructed under the south end of Puma Street in late <br />2017 through early 2018. Watermain does not exist under the segment of Puma Street proposed <br />to be reconstructed with the Puma Street improvements, though the Puma Street improvements <br />do propose to extend this line to Alpine Drive. <br />3.2.b Sanitary Sewer <br />A 10" PVC trunk gravity sanitary sewer line was constructed under the south end of Puma Street <br />in late 2017 through early 2018. Sanitary sewer does not exist under the segment of Puma Street <br />proposed to be reconstructed with the Puma Street improvements, though the Puma Street <br />improvements do propose to extend this line to Alpine Drive. <br />3.2.c Storm Sewer/Drainage <br />Storm sewer exists under the permanent section of Puma Street constructed in 2018. Storm sewer <br />does not exist under the segment of Puma Street proposed to be reconstructed with the Puma Street <br />improvements. <br />Feasibility Report <br />Puma Street Improvements <br />City of Ramsey Project No. 20-04 <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.