Laserfiche WebLink
U1 <br />0 <br />U <br />_ 12 <br />4, 3 <br />0 0 <br />H 1 <br />U <br />z <br />z <br />Ie3!J I) <br />CLL <br />QS <br />z <br />.ioAanans <br />0 <br />1- <br />0 <br />m <br />in <br />4, <br />a, <br />aauSisaa <br />aauSisaa <br />ao!uas <br />aaSeueW <br />pafoad <br />WORK TASK DESCRIPTION <br />E <br />a, <br />0 <br />0 <br />E <br />T4, <br />aU a) <br />a, <br />E +, <br />m ul <br />co <br />o E <br />>. 3 <br />+,a <br />U <br />U <br />Z ILI <br />u1 0 <br />J = <br />(J a <br />Topographic Survey, Final Design and Construction Staking <br />LO <br />N <br />61 <br />c-1 <br />0 <br />NJ <br />N <br />111 <br />t/)• <br />0 <br />O <br />1. <br />1� <br />t/)• <br />0 <br />M <br />t/)• <br />0 <br />m <br />00 <br />t/)• <br />O <br />to <br />M <br />t/I. <br />N <br />to <br />1� <br />d' <br />al <br />44 <br />(NI <br />oo <br />389 <br />c.n <br />t0 <br />N <br />to <br />N <br />% -1 <br />N <br />0 <br />0 <br />N <br />N <br />d' <br />Oi <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Oi <br />00 <br />34 <br />IS) <br />IS) <br />40 <br />00 <br />N <br />61 <br />nl <br />c-1 <br />M <br />N <br />45 <br />00 <br />24 <br />00 <br />24 <br />N <br />c-I <br />ri <br />N <br />% -1 <br />- <br />N <br />N <br />N <br />N <br />t0 <br />1.0 Roadway Design (Includes Topo and State Aid Plan Developement) <br />2.0 Trunk Utility Design (Sanitary Sewer and Water) <br />4.0 Storm Water Management and Storm Sewer Design <br />5.0 Reviews and Approvals <br />6.0 Permitting <br />7.0 Bidding Services (Questions & Addenda) <br />Subtotal Bolton & Menk <br />SUBCONSULTANT - Northern Technologies <br />TOTAL for Design through Bidding <br />Construction Services <br />Tr <br />M <br />oo <br />M <br />N <br />0 <br />0 <br />N <br />M <br />N <br />c-I <br />N <br />cl- <br />cl- <br />O <br />1.0 Construction Administration (Shop Drawings, Pay Requests, As Builts) <br />2.0 Construction Staking <br />