Laserfiche WebLink
=0 <br />/) <br />p <br />Om <br />UNIT PRICE <br />§ <br />§& <br />/ <br />00•000'88$ <br />00•000`05$ <br />$550.00 <br />$12,480.00 <br />$7,500.00 <br />$7,500.00 <br />$1,920.00 <br />$29,400.00 <br />$1,125.00 <br />$2,400.00 <br />$20,000.00 <br />$51,328.20 <br />$64,050.33 <br />$56,933.63 <br />00.000'3$ <br />00 000'03 <br />00•000`88$ <br />00'000`£l$ <br />$1,920.00 <br />$29,400.00 <br />\ <br />$550.00 <br />$12,480.00 <br />28 i\ <br />$7,500.00 <br />$7,500.00 <br />\ <br />$51,328.20 <br />- <br />$1,000.00 <br />$4,500.00 <br />\\\\k`� <br />$60.00 <br />$800.00 <br />$25.00 <br />$30.00 <br />$48.00 <br />$1,500.00 <br />$90.00 <br />$100.00 <br />$500.00 <br />$750.00 <br />00•000'8£$ <br />00•000'03 <br />$1.20 <br />$1.20 <br />$150.00 <br />\)L;L%;;=LL==LLL== <br />))§y2aaaa§§§[§§§§umLunmeee:i§7.mm=m <br />=L3§§333LL\\LL= <br />MOBILIZATION <br />DEWATERING <br />REMOVE CURB & GUTTER <br />REMOVE BITUMINOUS PAVEMENT <br />REMOVE PAVEMENT MARKING <br />COMMON EXCAVATION <br />SUBGRADE EXCAVATION <br />SELECT GRANULAR BORROW <br />TOPSOIL <br />CONNECT TO EXISTING SANITARY SEWER <br />8" SANITARY SEWER PIPE <br />10" SANITARY SEWER PIPE <br />SANITARY SEWER MANHOLE <br />CONNECT TO EXISTING WATER MAIN <br />6" WATER MAIN PIPE <br />8" WATER MAIN PIPE <br />16" WATER MAIN PIPE <br />6"-8" GATE VALVE AND BOX <br />16" GATE VALVE AND BOX <br />PIPE FITTINGS <br />HYDRANT <br />STORM SEWER PIPE <br />STORM SEWER CB/MH <br />AGGREGATE BASE CLASS 5 (8" THICK) <br />TYPE SP 12.5 NON -WEAR COURSE MIXTURE (3,C) 2.5" THICK <br />TYPE SP 12.5 WEARING COURSE MIXTURE (3,13) 2" THICK <br />ADJUST VALVE BOX <br />ADJUST STRUCTURE (SANITARY) <br />CONCRETE CURB & GUTTER DESIGN B618 <br />BITUMINOUS TRAIL <br />TRAFFIC CONTROL <br />EROSION CONTROL & TURF ESTABLISHMENT <br />4" SOLID LINE - EPDXY <br />4" BROKEN LINE - EPDXY <br />ARROW MARKING - EPDXY <br />Fa+li Report <br />Puma Street Improvements <br />City oRamsey P oject No. 20-04 <br />\ (\§/ k ( <br />;®kJ a <br />f 8888 / ! <br />} (kkk k <br />\ (k(( k ( <br />a a2\« i <br />Costruction Cost ONLY per LF: <br />ESTIMATED PROJECT COST: <br />