My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 03/24/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:44:13 PM
Creation date
4/8/2020 2:50:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCEPT DESIGN GUIDELINES <br />Municipal Plaza + Center Street + Pump House Building / Plaza <br />City of Ramsey, hilinnesota <br />Suggested Outline — draft December 2, 2019 <br />BACKGROUND +PURPOSE <br />SCHEMATIC DESIGN PLAID'S + PARK DESIGN PROGRAM <br />CONCEPT DESIGN GUIDELINES <br />1— Municipal Plaza & Center Street Streetscapes <br />• Site / grading / drainage plan (revised — Bolton and Menke <br />• Cross -sections <br />• Furniture / lighting recommendations <br />• Materials/finishes <br />2 Pump HousePlaza Building improvements <br />• Proposed building improvements (facade, rest rooms, etc.) <br />▪ Solar canopy (working with Conriexus Energy) <br />• Lighting recommendations <br />• Section drawings as needed (wail section, sketch details) <br />• Materials / finishes <br />3 — Pump House Plaza Public space <br />• Site / gradingf drainage plan (revised —Roston and Menk) <br />• Cross -sections <br />• Furniture / lighting recommendations <br />• Materials / finishes <br />PRELIMINARY COST EVALUATION <br />• Municipal Plaza <br />• Pump House Plaza Building Improvements <br />• Pump House Plaza Public Space <br />DESIGN + BUILD 'REP' FOR PUMP HOUSE PLAZA BUILDING IMPROVEMENTS <br />• Project scope / budget f schedule <br />• Draft + final'RFP' contents (for City Staff review and approval) <br />• Outline of budding/ contractor selection + construction process <br />(Note: Primary Architectural Consulting Services indicated in red.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.