My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 03/24/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:44:13 PM
Creation date
4/8/2020 2:50:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Based on the general condition and thickness of the existing pavement sections, WSB and <br />Associates and City Staff do not recommend completing mill and overlay improvements on these <br />street segments as proposed. It is estimated that the existing streets should remain serviceable with <br />moderate maintenance for up to 10 years. Once PASER ratings fall to 3 or less, a full -depth <br />reclamation (FDR) or reconstruction project should be completed. <br />3.2 Utilities <br />3.2.a Watermain <br />Watermain exists under all streets within the Regency Pond residential neighborhood and the <br />Business Park 95 industrial park. No improvements to the watermain is proposed in conjunction <br />with this project. <br />3.2.b Sanitary Sewer <br />Sanitary Sewer exists under all streets within the Regency Pond residential neighborhood and the <br />Business Park 95 industrial park. No improvements to the sanitary sewer is proposed in <br />conjunction with this project. <br />3.2.c Storm Sewer/Drainage <br />Storm sewer exists under several of the streets within the Regency Pond residential neighborhood <br />and the Business Park 95 industrial park, but it is not proposed to complete any significant repairs <br />or storm sewer construction as part of this project. <br />Feasibility Report <br />Amended 2020 Pavement Overlay Improvements <br />City of Ramsey Project No. 20-02A <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.