My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 04/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:46:29 PM
Creation date
4/15/2020 2:53:07 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule C — Trunk Storm Sewer Improvements & Outfall to River <br />Item Description <br />1. Jack 60" Casing <br />2. Jack 48" RCP <br />3. 48" Carrier Pipe <br />4. 42" RC Pipe Sewer Design 3006 CL <br />5. 48" RC Pipe Sewer Design 3006 CL <br />6. Jack 42" RCP <br />7. 42" FES <br />8. 48"kbS <br />9. 42" Outlet Structure <br />10. Skimmer Structure <br />11. Pond Liner <br />12. Sand Cushion <br />13. Storm Manhole <br />Subtotal: <br />OVERHEAD & CONTINGENCY 35%: <br />Extension <br />$78,000.00 <br />$126,000.00 <br />$13,760.00 <br />111 $21,600.00 <br />III $13,760.00 <br />$434,000.00 <br />$3,200.00 <br />$15,200.00 <br />$5,000.00 <br />$12,000.00 <br />$254,250.00 <br />$169,200.00 <br />$3,000.00 <br />$1,148,970.00 <br />$402,139.50 <br />Subtotal C — Trunk Storm Sewer Costs: $1,551,109.50 <br />MAXIMUM TOTAL COUNTY PARTICIPATION: $4,581,500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.