My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 04/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:46:29 PM
Creation date
4/15/2020 2:53:07 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 10. <br />Meeting Date: 04/14/2020 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title <br />Adopt Resolution #20-073 Approving Plans and Specifications and Authorizing Advertisements for Bids for 2020 <br />Crack Sealing Improvements, Improvement Project #20-00 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #20-073 approving plans and specifications and authorizing <br />advertisements for bids for 2020 Crack Sealing Improvements, Improvement Project #20-00. <br />Background: <br />Crack seal improvements are completed annually on between 13 and 23 miles of public street segments to <br />cost-effectively maximize the life of the bituminous pavement. <br />Crack sealing protects pavement by preventing stormwater runoff from seeping through cracks in the pavement and <br />joints between the pavement and concrete curb and gutter and utility castings, reducing future pavement damage <br />due to wet subgrade soils, especially during freeze -thaw cycles. <br />The City's current pavement maintenance schedule calls for public streets to be crack sealed the third, seventh, and <br />fourteenth year following construction, reconstruction, and overlay improvements. However, while this is the <br />typical maintenance schedule it is important to note that Staff reviews the condition of all streets annually and <br />adjusts the schedule of maintenance operations based on actual pavement conditions. <br />A total of 15.74 miles of public street segments are proposed to receive crack seal improvements in 2020. These <br />street segments were selected based on age, pavement maintenance history, and Pavement and Surface Evaluation <br />Rating (PASER) values. Crack seal improvements are typically performed on pavement sections with PASER <br />ratings of 7 or higher. Staff also attempts to select street segments that are in relatively close proximity to each other <br />in an attempt to receive lower bid prices for mobilization and traffic control bid items. <br />Plans and specifications for the 2020 Crack Sealing Improvements were prepared in-house as part of Staff's normal <br />duties. A copy of the plans are attached to this case. <br />Also attached is a figure showing which streets are proposed to receive crack seal improvements to the entire <br />pavement surface (red lines) versus streets that are only proposed to receive crack seal improvements along the <br />seam between the pavement and concrete gutter (blue lines). This is an area of special concern since gutters convey <br />large volumes of stormwater runoff and the seam between the pavement and gutter runs parallel to the direction of <br />flow. Therefore, any time this seam opens up it can allow large volumes of water to infiltrate into and beneath the <br />pavement section. <br />Notification: <br />No notifications were required for this case. However, upon adopting Resolution #20-073, advertisements for bids <br />will be published in the Anoka Union Herald and in Finance and Commerce on April 17th, and again on April24th. <br />Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.