My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 04/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:46:29 PM
Creation date
4/15/2020 2:53:07 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
included in Appendix B of the attached Feasibility Report. <br />The street improvements proposed with this project are identified in the City's current 10-year Capital <br />Improvement Program (CIP), and can be funded using a combination of Municipal State Aid Funds and <br />Stormwater Funds. Sanitary sewer and watermain improvements are not listed in the CIP but are required to support <br />future needs, and are feasible and cost-effective. <br />This project would best be constructed as a stand-alone project and is necessary, feasible, and cost-effective from an <br />engineering standpoint, and can be constructed as proposed herein. <br />Notification: <br />Notifications are not required for this case. <br />Observations/Alternatives: <br />Observations: <br />The proposed project schedule is included within the Feasibility Report. <br />Alternatives: <br />Alternative # 1 — Motion to adopt Resolution #20-071 accepting the Feasibility Report and ordering Plans and <br />Specifications for Improvement Project #20-01, Variolite Street Reconstruction. <br />Alternative #2 — Motion to deny adoption of Resolution #20-071 at this time. <br />Funding Source: <br />The Feasibility Report was prepared in-house as part of Staff's normal duties. <br />Costs incurred to date include: <br />• $29,750 for Northern Technologies Inc. to prepare the Geotechnical Exploration and Engineering Review. <br />• $13,650 for Hakanson Anderson to collect topographic survey and prepare the roadway easement exhibit. <br />• $1,283 for WSB to complete the pavement forensic report. <br />• $2,140 for Braun Intertec to prepare the drain tile design report. <br />The current CIP lists estimated project costs at $2,643,600, with $2,328,270 coming from Municipal State Aid <br />(MSA) Funds, and $315,330 coming from Stormwater Funds. No utility costs were identified in the CIP. <br />Estimated project costs per the Feasibility Report total $4,335,000. Below is a breakdown of the various project <br />costs, which includes $ 1,450,000 in trunk sanitary sewer and watermain project costs. <br />Project costs <br />Street Improvements $2,820,000 <br />Storm Sewer Improvements $65,000 <br />Sanitary Sewer Improvements $650,000 <br />Watermain Improvements $800,000 <br />Total estimated project cost $4,335,000 <br />Proposed funding <br />Municipal State Aid Funds $2,820,000 <br />Stormwater Fund $65,000 <br />Sanitary Sewer Fund $650,000 <br />Water Fund $800,000 <br />Total City Funding $4,335,000 <br />At the September 17, 2019 Public Works Committee meeting, the Committee approved moving forward with this <br />
The URL can be used to link to this page
Your browser does not support the video tag.