My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 04/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:46:29 PM
Creation date
4/15/2020 2:53:07 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�sl <br />20-01 Variolite Street Reconstruction <br />Ramsey, Minnesota <br />NTI Project No. 19. MSP09109.000 <br />SCOPE OF SERVICES <br />Sixty-one (61) borings were performed for the project. The scope of services included determining <br />existing bituminous and aggregate base thicknesses, groundwater levels, subsurface conditions, and <br />providing recommendations for site preparation, excavations, engineered fill and compaction, depths of <br />unsuitable soils to be removed, groundwater management, potential difficulties during construction, <br />utility construction, and estimated soil support parameters (R-values) for pavement design. <br />PROJECT AND SITE DESCRIPTION <br />The street improvements include reconstruction of existing bituminous streets and the installation of <br />public utilities. The project area includes approximately 2.25 miles of roadway along Variolite Street <br />Northwest and 161st Avenue Northwest in Ramsey, Minnesota. <br />NTI was not aware of invert elevations or other design details of the proposed utilities at the time this <br />report was prepared. <br />SUBSURFACE EXPLORATION SUMMARY <br />NTI performed the subsurface exploration program during the period of September 23 through 26, 2019 <br />with two -person crews using a truck -mounted CME-55 drill rig and an ATV -mounted CME-750 drill rig. <br />Samples were generally collected in accordance with ASTM D 1586 "Standard Test Method for Standard <br />Penetration Testing (SPT) and Split -Barrel Sampling of Soils." Pavement cores were obtained at each <br />boring location. <br />The boring locations and depths were determined by a representative of the City of Ramsey and were <br />marked in the field by NTI. The borings terminated at depths ranging from approximately 10.5 to 18.5 <br />feet below the top of pavement. Due to soft / very loose soil conditions at the termination depth of <br />Borings SB-9, SB-15, and SB-39, these borings were extended to depths ranging from approximately 13.0 <br />to 18.5 feet below the top of pavement. <br />NTI located the borings relative to existing site features and subsequent to drilling operations <br />determined the approximate elevation, latitude and longitude of the borings using a handheld Trimble <br />GeoXH 6000 GPS unit (Anoka County datum). Boring elevations, latitude, and longitude should be <br />considered to be approximate. <br />Please refer to the Boring Location Diagrams and the Boring Logs in Appendix C, and the Pavement Core <br />Photographs in Appendix D. <br />Page 2 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.