Laserfiche WebLink
CASE <br /> <br />RECEIVE TRAFFIC VOLUME INFORMATION FOR <br />MALLARD PONDS - FLINTWOOD HILLS AREA <br />By:Steven Jankowski, City Engineer <br /> <br />Background: <br /> <br />At the January 18, 2005 Public Works Committee meeting it was explained that the <br />closure of Barium Street, a private roadway acc6ssing onto CR 116 was anticipated as an <br />element of the County road project scheduled to take place this fall which would upgrade <br />the segment of CR 116 from TH 47 to Germanium Street as a four lane divided highway. <br />There was support for the closure of Barium Street onto CR 116 from both the residents <br />of the Mallard Ponds subdivision and the City. However the closure of Barium Street <br />would leave the Mallard Ponds subdivision with a single access point at 140th Avenue. <br />The consensus of the Public Works. Committee was that there needs to be more than one <br />access into this subdivision. There was also direction to staff to research the feasibility of <br />closing the connection of 142nd Avenue between Argon Street and TH 47, such that the <br />emergency gate access on the south end of Argon Street might be removed and thereby <br />provide a second access point to the Mallard Ponds subdivision. <br /> <br />In an effort to begin an analysis of the traffic imPacts that any changes may cause it is <br />important to establish a sound background of the current traffic patterns within.the area. <br />After consultation with a traffic engineer, traffic counter were set out at the locations <br />identified on the attached exhibit. A complete summary of these traffic counts will be <br />made available at the Committee meeting. <br /> <br />In evaluating the magnitude of the traffic impacts, a next logical step would be to <br />temporarily modify the street system in the area by (a) closing 142nd Avenue east of <br />Argon Street; (b) opening the gate at the south end of Argon Street; and (c) barricading <br />thc access of Barium Street onto CR 116. <br /> <br />The opening of the gate at Argon Street will involve the cooperation with the one of the <br />two Mallard Pond townhome associations. A number of residents of the Mallard Ponds <br />subdivision expressed serious concern over the permanent opening of the gated access on <br />Argon Street, and the Flintwood neighborhood to the north would also be affected. It is <br />therefore important that a forum for public involvement be established in addressing this <br />proposal. Perhaps, an ad hoc committee of residents might be formed to work with staff <br />on identifying specific concerns and how they might be addressed. It would also be <br />advisable to prepare a newsletter outlining the proposed modifications and process. <br /> <br />Recommendation: <br /> <br />Staff recommends that it be directed to contact the townhouse association to-request the <br />temporary opening of the Argon Street gate ~vhich would be done in conjunction with the <br />temporary closure of 142"d Avenue east of Argon Street and the barricading of Barium <br /> <br />57 <br /> <br /> <br />