My WebLink
|
Help
|
About
|
Sign Out
Home
05/01/90
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1990
>
05/01/90
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:04:39 AM
Creation date
4/18/2005 11:55:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
05/01/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACH}~ENT 2 <br /> <br />AEC - HIGH PRESSURE SODIUM STREET LIGHTS <br /> February 2, 1990 <br /> <br />Rate Bi9 --High Pressure Sodium Street Lighting Service <br />Availability <br /> <br />Available to Municipalities or Rural Communities within Anoka Electric <br />Cooperative's (AEC) service area for controlled high pressure sodium <br />street lighting systems, furnishing light from dusk to dawn. <br /> <br />Monthly B.~ll <br /> <br />Payment of the monthly bill shall be made by the due date marked on <br />the bill. If not paid by the due date, the consumer shall pay a late <br />charge of $1.50 plus 1-1/3% of the amount billed in addition to the <br />biilD Additional late charges of $1.50 and 1-1/3% shall be <br />a~cumulated for each month the bill remains unpaid. <br /> <br />Monthly Rate for Cooperative ,AEC Owned Light <br /> <br /> Approximate Monthly <br />Lamp Lumens Rate <br />Watts Per Lamp Overhead Underground <br /> <br />100 8,550 7.88 10.16 <br />!50 14,400 9.59 11.67 <br />250 27,000 12.77 14.85 <br /> <br />Conditions of Service Where the-eosperatkve AEC Owns the-Lighting <br />System .. <br /> <br /> Each li§ht shall have an installation fee based on the type of <br /> light requested and any special installation fees as required. <br /> <br />The-~ooperat~ve AEC shall furnish, install and maintain the <br />necessary energy and equipment for a controlled street lighting <br />system of either overhead or underground type construction.. <br />Materials furnished shall be of a standard type selected by the <br />Cooperative AEC. <br /> <br />Resuest for initial service indicating the la~p size, ~ype of <br />construction desired, fixture location, may b~ requested by a <br />developer, but shall.be accompanied by written authorization from <br />an official of the Municipality or representative of the <br />Co~Jnunity reGuestinq service. Requests for changes in lamp size <br />or ~_he addition or deletion of fixtures shall be made in writing <br />by an authorized official of the Municipality or representative <br />of the Community requesting service. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.