My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 04/28/2020
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2020
>
Agenda - Council Work Session - 04/28/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:47:36 PM
Creation date
4/24/2020 10:21:58 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
04/28/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
78 <br />2040 Future Roadway Capacity Improvement Needs <br />To identify the need for potential future capacity improvements, Metropolitan Council 2040 <br />forecasts were compared to planning -level roadway capacities for Principal and A -Minor Arterial <br />Roadways. Planning -level roadway capacities used for this analysis are illustrated in Table 37 of <br />this chapter. Based on this comparison, most roadways in the city have adequate capacity to <br />accommodate forecasted Metropolitan Council 2040 travel volumes with little to minimal <br />congestion. These roadways are expected to function well through the 2040 planning horizon. <br />Based on these planning level roadway capacities, portions of TH 47, US 10, Armstrong Boulevard <br />(CSAH 83), and Ramsey Boulevard (CSAH 56) a, e t„pe,.led to exceed capacity in 2040. TH 47 is <br />currently a rural two-lane roadway with a planning -level capacity of 10,000-12,000 and a <br />forecasted 2040 volume of 9,4600-22,200. US 10 is a four -lane divided roadway with a planning - <br />level capacity of 28,000-32,000 and a forecasted 2040 volume of 44,000-67,000. Armstrong <br />Boulevard (CSAH 83) and Ramsey Boulevard (CSAH 56) each vary between two and four lanes <br />within Ramsey, but each roadway includes a segment where the forecasted 2040 volume would <br />surpass the associated planning -level capacity for a two-lane undivided roadway of 10,000-12,000 <br />(15,300 for Armstrong Boulevard and 14,100 for Ramsey Boulevard). US Highway 10 also has <br />forecasted 2040 volumes that exceed its capacity through Ramsey. Accordingly, motorists will <br />likely experience some congestion along these roadways during the 2040 planning horizon. <br />city of RAMSEY <br />Comprehensive Plan 2040 <br />
The URL can be used to link to this page
Your browser does not support the video tag.