My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/28/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 04/28/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:47:04 PM
Creation date
4/24/2020 1:27:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/28/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Funding Availability, Minimums, and Maximums <br />A total of approximately $180 million in federal funds is anticipated to be available in this solicitation for <br />program years 2024 and 2025. As shown in Table 2, modal funding ranges have been established by <br />TAB, based on historic levels, to give applicants an understanding of the general funding levels <br />available by mode. TAB reserves the right to adjust these modal funding levels depending on the <br />amount and quality of projects submitted. In addition, TAB approved a target to allocate approximately <br />$10 million to the Bridge Rehabilitation/Replacement category, as part of the Roadways Including <br />Multimodal Elements category. Base -level 2024 and 2025 TDM funding for the TMOs and Metro Transit <br />will be taken out of the Transit and TDM category for the next solicitation. Additionally, there is $1.2 <br />million of TDM funding that is available for 2022 and 2023 for innovative projects from the previous <br />solicitation. <br />Table 2: Modal Funding Levels* <br />Roadways Including Bicycle and Pedestrian <br />Multimodal Elements Transit and TDM Facilities Total <br />Modal Range of 46%-65% <br />Funding Range of $83M-$117M <br />Levels Midpoint $100M <br />Range of 25%-35% Range of 9%-20% <br />Range of $45M-$63M Range of $16M-$36M <br />Midpoint $54M Midpoint $26M <br />100% <br />$180M <br />(Est)* <br />* 2.5% ($4M-$5M) will be set aside for unique projects out of the total funds available, leaving the remaining funds <br />to be distributed to the above modes within the percentage ranges shown. Amounts shown assume that some <br />level of over pg uv, ;„g will occur, but TAB will determine the exact amount as part of project selection. <br />Within Roadways Including Multimodal Elements, at least one project will be funded from each of the <br />five eligible functional classifications: A -minor arterial augmenters, connectors, expanders, and <br />relievers, as well as non -freeway principal arterials. <br />Within the Transit modal category, there is a new Arterial Bus Rapid Transit Project category. There is <br />also a New Market guarantee to ensure that at least one Transit Expansion or Modernization project is <br />funded that serves areas outside of Transit Market Area 1 and 2 from the Transportation Policy Plan for <br />at least one end of the project. The combined maximum funding amount for bus rapid transit projects <br />funded in the Arterial Bus Rapid Transit Project, Transit Expo, &Ku, i, and Transit Modernization <br />categories will be $32,000,000. <br />For the first time, 2.5% of the total available funds available will be set -aside for Unique Projects, <br />including the Travel Behavior Inventory/Regional Travel Model. These 2024 and 2025 funds will be <br />allocated as part of the 2022 Regional Solicitation, closer to project implementation. TAB will first <br />appiuvc. a funding level for the Travel Behavior Inventory/Regional Travel Model and then the <br />remaining funds will be considered for any submitted Unique Projects. TAB may elect to fund Unique <br />Projects at an amount lower than 2.5% (approximately $4.5 million), depending on the amount and <br />quality of the submittals. Details on project selection and eligibility will be worked out prior to the 2022 <br />funding cycle. <br />Table 3 shows the minimum and maximum federal award for application categories that applicants can <br />apply for as part of the Regional Solicitation. The values do not account for 20 percent local match <br />minimum that applicants must contribute to the project. <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.