My WebLink
|
Help
|
About
|
Sign Out
Home
05/22/01
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
2000's
>
2001
>
05/22/01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 4:04:12 PM
Creation date
5/13/2003 2:40:52 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
05/22/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVE AND SELECT AN ARCHITECTURAL PROPOSAL FOR THE <br />PROPOSED CITY HALL EXPANSION/RENOVATION PROJECT <br /> Kim Moore-Sykes, Assistant City Administrator <br /> <br />Background: <br />In June of 1999, Boarman, Kroos, Pfister, Vogel & Associates, (currently BKV Group), <br />hired as the result of a formal selection process presented the City Council with a needs <br />assessment study for the Ramsey City Hall. At the time it was determined that as the <br />community was growing and changing, that the level of services and expectations would <br />also increase. According to the needs study, this would certainly impact the City's need <br />to hire additional staff to meet growing service expectations, provide adequate meeting <br />spaces for the community and upgrade internal systems, such as the HVAC system, that <br />were not constructed or designed to handle the additional demands that workspace <br />addition or reconfiguration would cause. <br /> <br />The original needs assessment did review future staff increases and the resultant need for <br />additional space in City Hall to accommodate those increases. In reviewing the study, <br />each department was looked at and staffing needs were projected out for five years. <br />Since the 1999 study all departments with the exception of Administration have basically <br />achieved the projected or exceeded the 2-year staffing projections. <br /> <br />About a year ago, Administration reviewed its staffing needs and the department was <br />reorganized to accommodate changing service demands and expectations. The <br />Administrative Services Manager position was essentially divided into two positions, the <br />Assistant City Administrator and the Human Resources Manager; the secretarial pool was <br />dismantled and each department added their own department secretary; and a receptionist <br />and a secretary left the City of Ramsey. Consequently, two half time positions were <br />combined to create a full time secretarial position and a receptionist was hired. <br /> <br />Last summer, most departments at City Hall had their workspace reconfigured to allow <br />for additional staff. In most cases, this resulted in smaller workspace areas. The Finance <br />Department had to relocate several filing cabinets to the basement in order to <br />accommodate an additional workspace for the TIF Specialist; Community Development <br />reconfigured their workspace to accommodate the department secretary and an intern; and <br />Engineering was temporarily moved to the basement to accommodate another <br />engineering position and a department secretary. Accessibility issues and convenience <br />for residents required that the Engineering Department be eventually returned upstairs to <br />the main level. This move upstairs was implemented when the City Council chambers <br />were temporarily relocated to the new fire station in April. The Engineering Department <br />also required available meeting space, which they did not have in the basement level of <br />City Hall and the second half of the old Council Chambers now provides. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.