F.C. CASE # q <br /> <br />REQUEST FOR CHANGE ORDER TO IMPROVEMENT PROJECT 00-21,143m) <br />AVENUE NW STREET AND UTILITY CONSTRUCTION <br /> By: Brian E. Olson, City Engineer <br /> <br />Background: <br /> <br />The construction of 143rd Avenue NW between Jaspar Street NW and County Road 116 started <br />early this Spring and will continue and be completed by the end of the summer. During the <br />construction of the facilities that would enable development to occur in Gateway Industrial Park <br />No. 5, we constructed a regional pond for the development of the industrial park to occur. Due to <br />the substantial amount of rain that we have gotten this summer, the Contractor has requested a <br />change order to install a wood fiber blanket embedded with a seed mixture to control erosion and <br />establish turf in the pond. The original Contract called for the area to be seeded. <br /> <br />Although seeding does allow for turf establishment, it does take awhile to act as an erosion <br />inhibitor. The pond Could be completely sodded, which would result in an almost immediate <br />erosion inhibitor, but would be an increase in over $25,000 of additional cost to the project. The <br />original estimate prepared for the change order for the wood fiber blanket came to almost <br />$21,000. In discussions with the Contractor, Staff has asked that the price be reduced because of <br />the increase in quantities and increased effectiveness for maintenance thereby easing the burdens <br />that the Contractor would be responsible for erosion control. A letter from Erickson <br />Construction, Inc. explaining the proposal will be distributed at the Finance Committee. <br /> <br />We are also asking to substitute the wood fiber blanket for the boulevard sod that was anticipated <br />in areas where there is not an established business. This will be a cost savings to the project and <br />can eliminate the need for extensive care that sometimes are required for sodded areas. <br /> <br />Recommendation: <br /> <br />It is staff's recommendation to enter into a Change Order to authorize Erickson Construction to <br />install wood fiber blanket on the ponding and boulevard areas in the project to help establish the <br />turf sooner and minimize the erosion potential of the exposed soil. <br /> <br />Council Action: <br /> <br />Motion to authorize Erickson Construction to install wood fiber blanket on the ponding and <br />boulevard areas in the project to help establish the turf sooner and minimize the erosion potential <br />of the exposed soil. <br /> <br />Reviewed by: <br />City Administrator <br />Director of Public Works <br />Finance Officer <br /> <br />FC: 06/26/01 <br /> <br /> <br />