My WebLink
|
Help
|
About
|
Sign Out
Home
06/26/01
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
2000's
>
2001
>
06/26/01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 4:04:25 PM
Creation date
5/13/2003 2:41:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
06/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.C. CASE # q <br /> <br />REQUEST FOR CHANGE ORDER TO IMPROVEMENT PROJECT 00-21,143m) <br />AVENUE NW STREET AND UTILITY CONSTRUCTION <br /> By: Brian E. Olson, City Engineer <br /> <br />Background: <br /> <br />The construction of 143rd Avenue NW between Jaspar Street NW and County Road 116 started <br />early this Spring and will continue and be completed by the end of the summer. During the <br />construction of the facilities that would enable development to occur in Gateway Industrial Park <br />No. 5, we constructed a regional pond for the development of the industrial park to occur. Due to <br />the substantial amount of rain that we have gotten this summer, the Contractor has requested a <br />change order to install a wood fiber blanket embedded with a seed mixture to control erosion and <br />establish turf in the pond. The original Contract called for the area to be seeded. <br /> <br />Although seeding does allow for turf establishment, it does take awhile to act as an erosion <br />inhibitor. The pond Could be completely sodded, which would result in an almost immediate <br />erosion inhibitor, but would be an increase in over $25,000 of additional cost to the project. The <br />original estimate prepared for the change order for the wood fiber blanket came to almost <br />$21,000. In discussions with the Contractor, Staff has asked that the price be reduced because of <br />the increase in quantities and increased effectiveness for maintenance thereby easing the burdens <br />that the Contractor would be responsible for erosion control. A letter from Erickson <br />Construction, Inc. explaining the proposal will be distributed at the Finance Committee. <br /> <br />We are also asking to substitute the wood fiber blanket for the boulevard sod that was anticipated <br />in areas where there is not an established business. This will be a cost savings to the project and <br />can eliminate the need for extensive care that sometimes are required for sodded areas. <br /> <br />Recommendation: <br /> <br />It is staff's recommendation to enter into a Change Order to authorize Erickson Construction to <br />install wood fiber blanket on the ponding and boulevard areas in the project to help establish the <br />turf sooner and minimize the erosion potential of the exposed soil. <br /> <br />Council Action: <br /> <br />Motion to authorize Erickson Construction to install wood fiber blanket on the ponding and <br />boulevard areas in the project to help establish the turf sooner and minimize the erosion potential <br />of the exposed soil. <br /> <br />Reviewed by: <br />City Administrator <br />Director of Public Works <br />Finance Officer <br /> <br />FC: 06/26/01 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.