My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/26/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 04/26/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:48:09 PM
Creation date
4/22/2005 9:25:01 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/26/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDEMNIFICATION AGREEMENT <br /> <br /> Tt-[IS Indemnification Agreement (this "Agreement") is made and entered into as of <br />April I 1,2005, by and between Shingobee Builders, Inc., a Minnesota corporation <br />("Shingobce") and the City of Ramsey, a Minnesota municipal corporation ("City"). <br /> <br />RECITALS: <br /> <br />Shingobce bas entered into a construction agreement whereby it has agreed to perform <br />certain work on behalf of Ramsey Town Center, LLC, a Minnesota limited liability <br />company in that certain Anoka County, Minnesota subdivision known as Ramsey Town <br />Center Addition (the "RTC Plat"). <br /> <br />Tim development of the RTC Plat is controlled by that certain master Development <br />Agreenmnt dated Septenqber 17, 2003, and recorded September 24, 2003, as Document <br />No. 1854364 (Anoka County Abstract) and Document No. 446333 (Anoka County <br />Torrens) (the "Master Development Agreement"). <br /> <br />Thc Master Development Agreement requires the developer to construct certain <br />infrastructure for the RTC Plat including storm water improvements. <br /> <br />D. <br /> <br />The plans for the RTC Plat storm water improvements include three pipe crossings. There <br />currently exists all indemnification agreement between the City of Ramsey and <br />Shingobce Builders, Dated December 28, 2004, covering these two 54 inch diameter <br />pipelines that are to be constructed across or along the Burlington Northern and Santa Fe <br />Railway ("BNSF") railroad adjacent to the RTC Plat (the "Pipeline"). This <br />indemnification agreement is for the third crossing under the railroad. The 3rd crossing is <br />shown on page 11/25 in the Storm Sewer Document Package dated March 4, 2005. The <br />pipe runs fi'om CBMH 717 to the City Pond. <br /> <br />BNSF requires before anyone enters on or constructs any facilities within its railroad <br />hght-o£-way that a license be obtained from it for such work. The City has agreed to <br />obtain a Pipeline License dated attached hereto as Exhibit "A" which is <br />required by BNSF for construction of the Pipelines (the "Pipeline License"). <br /> <br />I~'. In consideration for the City obtaining the Pipeline License Shingobee agrees to <br /> indcmni fy the City from all liability associated with the construction of the Pipeline. <br /> <br /> NOW, THEREFORE, in consideration of the mutual agreements contained herein and <br />other good and valuable consideration the receipt and sufficiency of which are hereby <br />acknowledged, tile panics agree as follows: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.