Laserfiche WebLink
03/20/2020 10:23 AM <br />All stormwater ponds must have a maintenance access covered by drainage and utility <br />easement. <br />Thie surface should be vegetated with slopes gentle enough for equipment access. Lot spacing <br />must be adjusted to provide this required access route. <br />0 Replies <br />17 - Review Comments <br />Created by: Len Linton <br />On: 03/16/2020 11:44 AM <br />All comments must be addressed on the next submittal in order to keep this project moving <br />forward. <br />Unaddressed comments may delay approval of the next submittal. <br />18 Stormwater <br />0 Replies <br />Created by: Len Linton <br />On: 03/16/2020 12:21 PM <br />Stormwater Design must meet Lower Rum River Watershed Managment Organization <br />requirements. <br />Compliance with infiltration must be demonstrated using the MIDS calculator from the MPCA, P-8 <br />or Win-SLAMM software. Printouts provided must include data input and results including <br />removal efficiencies. <br />0 Replies <br />19 - Wetland Setback and Pond <br />Created by: Chloe McGuire Brig! <br />On: 03/19/2020 09:03 AM <br />16.5 foot d/u easement required from edge of delineated wetland, no ponds in that area. <br />0 Replies <br />Page 4 <br />