Laserfiche WebLink
EP <br />NVIRONMENTALROTECTIONS <br />The City requires a delineated wetland at time of preliminary <br />16.5 foot setback under easement from <br />plat and requires a <br />any wetland <br />to protect them <br />This project is large enough that it will require an <br />Environmental Assessment Worksheet (EAW), <br />DNR has <br />seen Sketch Plan <br />The City Council has included in their 2020 Strategic Plan an <br />a Corridor Study of the entire Nowthen <br />action to complete <br />Boulevard Corridor <br />. Staff is working with Anoka County to <br />advance this study later in 2020 or in early 2021 <br />Tree survey required onsite, City Staff includes a Certified <br />Arborist <br /> <br />