My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/26/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 05/26/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:49:10 PM
Creation date
5/27/2020 9:08:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/26/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: 05/26/2020 <br />Submitted For: Grant Riemer, Engineering/Public Works <br />By: Grant Riemer, Engineering/Public Works <br />5. 3. <br />Information <br />Title <br />Approve Additional Design Services Fee Request for Ramsey Public Works Facility <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to approve additional design services request from Oertel Architects. <br />Background: <br />During the RFP period, the scope of the project was illustrated in a previous study from 2015 performed by BKV. <br />The preferred option from that study included a building of roughly 76,200 SF, site storage bins, fuel island and <br />relocation of the existing salt building, site work area and no additional site storm water storage, and some minor, <br />mostly undefined remodeling of the existing facilities. During the programming and schematic design process for <br />our project, Oertel and city staff have identified a scope of building that includes 93,000 SF of building footprint <br />with the addition of the building extension to be bid as an alternate, included site bins and fuel island, site work area <br />and additional stormwater control features. The salt building will not be relocated as part of this project and the <br />remodeling will also likely not take place. Most of this request will be a shift of fee dollars already accounted for in <br />the prime agreement for the project, that was originally purposed for the renovation and remodel of the existing <br />structures. Given the current direction of the project, that scope of work will not occur within this project budget. <br />Attached to the case is the proposal from Oertel Architects explaining the additional service requests and outlined <br />by design discipline, providing a brief general explanation of those additional work efforts requiring the additional <br />fee dollars with the total estimated amount of the request. Summary of request: Gross Request for Additional <br />Services $58,247.38 Deduct / Reallocation of Renovation Fee -$35,490.00 Balance of Additional Request <br />$22,757.38 Article 11.4 of Prime Agreement for Additional Services $682.72 Full Additional Services Request <br />$23,440.10 Original Contract amount $585,491.21 Total new Contract amount $608,931.31 <br />Notification: <br />N/A <br />Observations/Alternatives: <br />This item is included in the May 26 work session project update case to allow discussion prior to the regular <br />meeting. <br />The $35,490.00 that was allocated in the original Oertel contract for renovation/remodeling, will be combined with <br />the additional requested fees of $23,440.10 to cover the additional scope changes in the project. A detailed <br />summary of request and allocations would be as follows: Oertel Architects $8,160.00 <br />SRF $3,847.38 <br />Meyer-Borgman-Johnson $16,000.00 <br />Emanuelson-Podas $30,240.00 <br />Total Additional Fee Request $58,247.38 <br />A full accounting of how these fees were arrived at is included in the attached letter. <br />Funding Source: <br />Facility Fund <br />
The URL can be used to link to this page
Your browser does not support the video tag.