My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/26/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 05/26/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:49:10 PM
Creation date
5/27/2020 9:08:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/26/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fA <br />OERTEL <br />ARCHITECTS <br />1795 St. Clair Avenue <br />St. Paul, MN 55105 <br />(651) 696-5186 <br />www.oertelarchitects.com <br />ST. PAUL I HIBBING <br />Additional Design Services Fee Request — Ramsey Public Works Facility <br />Date: May 13, 2020 <br />To: Grant Reimer, Public Works Superintendent City of Ramsey <br />CC: Kurt Ulrich, City Administrator City of Ramsey <br />Project: Ramsey Public Works <br />RE: Additional Design Fee Request <br />Dear Mr. Reimer, <br />Thank you for taking the time on Friday, May 8th to review and discuss with Oertel Architects, the <br />additional design fee request for Ramsey Public Works. As stated during that discussion, most of this <br />request will be a shift of fee dollars already accounted for in the prime agreement for the project, that <br />was originally purposed for the renovation and remodel of the existing structures. Given the current <br />direction of the project, that scope of work will not occur within this project budget. The remaining <br />additional service requests are outlined by design discipline, providing a brief general explanation of <br />those additional work efforts requiring the additional fee dollars with the total estimated amount of the <br />request. <br />SUMMARY OF REQUEST <br />Gross Request for Additional Services <br />Deduct / Reallocation of Renovation Fee <br />Balance of Additional Request <br />Article 11.4 of Prime Agreement for Additional Services <br />Full Additional Services Request <br />Original Contract amount <br />Total new Contract amount <br />$58,247.38 <br />-$35,490.00 <br />$22,757.38 <br />$682.72 <br />$23,440.10 <br />S585.491.21 <br />$608,931.31 <br />BACKGROUND <br />During the RFP period, the scope of the project was illustrated in a previous study from 2015 performed <br />by BKV. The preferred option from that study included a building of roughly 76,200 SF, site storage bins, <br />fuel island and relocation of the existing salt building, site work area and no additional site storm water <br />storage, and some minor, mostly undefined remodeling of the existing facilities. During the <br />programming and schematic design process for our project, we have identified with you a scope of <br />building that includes 93,000 SF of building footprint with the addition of the building extension to be <br />bid as an alternate, included site bins and fuel island, site work area and additional stormwater control <br />features. The salt building will not be relocated as part of this project and the remodeling will also likely <br />not take place. For reference I have attached at the end of this memorandum the proposed fee from <br />our initial proposal to illustrate fee and approximate hours for each phase of design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.