My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/26/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 05/26/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:49:10 PM
Creation date
5/27/2020 9:08:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/26/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 8. 5. <br />Meeting Date: 05/26/2020 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #20-106 Approving Plans and Specifications and Authorizing Advertisements for Bids for Puma <br />Street Improvements, Improvement Project #20-04 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider adopting Resolution #20-106 approving plans and specifications and <br />authorizing advertisements for bids for Puma Street Improvements, Improvement Project #20-04. <br />Background: <br />Existing Infrastructure <br />The improvements proposed with this project are the last in a series of improvement projects providing street, trail <br />and trunk utility improvements to serve numerous commercial and residential developments in the general area. <br />In 2006, Bunker Lake Boulevard was improved west of Armstrong Boulevard. The easterly 2,650 feet or so was <br />constructed with trunk 18-inch polyvinyl chloride (PVC) sanitary sewer and 16-inch ductile iron pipe (DIP) <br />watermain under a permanent bituminous pavement section. The westerly 1,400 feet or so of Bunker Lake <br />Boulevard to Puma Street, as well as all of Puma Street between Bunker Lake Boulevard and Alpine Drive, was <br />constructed without trunk utilities and only a temporary pavement section generally consisting of 3 inches of <br />aggregate base under 2 inches of bituminous pavement. Based on future demand, trunk utilities were ultimately <br />proposed to be extended to and along Puma Street, after which the temporary pavement sections would be replaced <br />with permanent pavement sections. <br />In the fall of 2017, approximately 1,400 linear feet of municipal trunk utility extension improvements were <br />constructed along the west end of Bunker Lake Boulevard to Puma Street. These trunk utilities were required to <br />serve portions of the new Riverstone residential development west of Puma Street, as well as a portion of the new <br />Bunker Lake Industrial Park development south of Bunker Lake Boulevard. <br />In late 2017 through early 2018, trunk utility improvements were extended along Puma Street, north of Bunker <br />Lake Boulevard. These utility improvements were required to serve a majority of the Riverstone residential <br />development, future commercial and residential development east of Puma Street, plus some undeveloped land in <br />the Northfork development, west of the Riverstone development. These development areas are all designated as <br />municipal urban service areas (MUSA) thereby requiring service by City sewer and water. <br />In the summer/fall of 2018, permanent street and trail improvements were constructed on the sections of Bunker <br />Lake Boulevard and Puma Street where trunk utility improvements were constructed. <br />Proposed Improvements <br />The proposed Puma Street Improvements are being driven by two proposed residential developments, one on each <br />side of Puma Street south of Alpine Drive, including Alpha Development by AKM Farm/Paxmar on the east side of <br />Puma Street, and Riverstone 4th Addition by Capstone Homes on the west side. Figures showing the locations and <br />scope of both developments are attached to this case. <br />This spring Capstone Homes began development of Riverstone 4th Addition, which is located on the north half of <br />
The URL can be used to link to this page
Your browser does not support the video tag.