CC Work Session 2. 2. <br />Meeting Date: 05/26/2020 <br />Information <br />Title: <br />Staff Update on Progress of the New Public Works Building <br />Purpose/Background: <br />Purpose: <br />Review the progress of design work on the new PW Facility <br />Background: <br />1), Staff has been working closely with Oertel Architects and RJM Construction on the design phase of the new PW <br />building. The design team and staff attended a video conference on May 8th to take the first look at the mechanical <br />and electrical systems for the building. Staff also met with the design team at Moline Concrete on May 15th to take <br />the first look at the precast wall panels including materials and color combinations. We will be meeting again on <br />May 22nd to continue the design work and start refining the building features. <br />One of the questions raised was about equipping the building for possible future solar energy and the up front cost <br />for that upgrade to the building structure. After speaking with the architect and RJM the estimated cost for the <br />upgrade was $90,000.00. During the design process staff has been working to identify areas where we can reduce <br />cost, but not effect the over functionality of the building. Some of those areas are: <br />Reducing the number of tables and chairs in the training/lunch room <br />Various ventilation equipment changes throughout the building <br />Dust collection in the wood shop will be installed at a later date, when that overall function is better defined. <br />Removing the in -floor heat in the office area and replacing with electric base board heat <br />Relocating the transformer and future emergency generator location to reduce feeder lengths <br />Removing one 12,000# hoist from vehicle maintenance area. May be added back at a future date when demand <br />dictates. <br />As we continue to get more detailed in the building design we will continue to look for opportunities to reduce <br />initial costs. <br />2). On the Council Consent Agenda this evening is a case to approve additional design services request from Oertel <br />Architects. <br />Background: <br />During the RFP period, the scope of the project was illustrated in a previous study from 2015 performed by BKV. <br />The preferred option from that study included a building of roughly 76,200 SF, site storage bins, fuel island and <br />relocation of the existing salt building, site work area and no additional site storm water storage, and some minor, <br />mostly undefined remodeling of the existing facilities. During the programming and schematic design process for <br />our project, Oertel and city staff have identified a scope of building that includes 93,000 SF of building footprint <br />with the addition of the building extension to be bid as an alternate, included site bins and fuel island, site work area <br />and additional stormwater control features. The salt building will not be relocated as part of this project and the <br />remodeling will also likely not take place. Most of this request will be a shift of fee dollars already accounted for in <br />the prime agreement for the project, that was originally purposed for the renovation and remodel of the existing <br />structures. Given the current direction of the project, that scope of work will not occur within this project budget. <br />Attached to the case is the proposal from Oertel Architects explaining the additional service requests and outlined <br />by design discipline, providing a brief general explanation of those additional work efforts requiring the additional <br />fee dollars with the total estimated amount of the request. Summary of Request: <br />Gross Request for Additional Services $58,247.38 <br />Deduct / Reallocation of Renovation Fee -$35,490.00 <br />