My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 03/08/2005
Ramsey
>
Public
>
Minutes
>
Council
>
2005
>
Minutes - Council - 03/08/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 1:44:01 PM
Creation date
4/28/2005 7:23:50 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
03/08/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
additional 210 stalls. The pedestrian overpass would be part of a future phase. The parking <br />structure will serve the parking needs for the Town Center core, the adjacent Ramsey Municipal <br />Center, and present and future transit services. The structure will be located on Civic Center <br />[)rive with an access from Sunwood Drive. <br /> <br />Community Development Director Trudgeon indicated staff took a hard look at the budget and <br />the design of the building to make sure it was a quality building while not exceeding the <br />preliminary budget. In order to do that, staff is proposing to reduce the amount of finishing along <br />the lower portion of the north elevation (Sunwood Drive) due to the fact that it will eventually be <br />covered by the retail building. Staff is also proposing a more basic design along the western <br />elevation since this faCade will need to be removed as part of the second phase expansion to the <br />west. <br /> <br />Motion by Councilmember Cook, seconded by Councilmember Elvig, to approve the preliminary <br />site plan for the Ramsey Municipal Parking Facility contingent upon compliance with City Staff <br />Review l,etter dated March 4, 2005 and the platting of the Subject Property. <br /> <br />Motion carried. Voting Yes: Mayor Oamec, Councilmembers Cook, Elvig, Olson, Pearson, and <br />Strommen. VotingNo: None. Absent: CouncilmemberJeffrey. <br /> <br />Case #10: Report from Personnel Committee <br /> <br />Mayor Gamec indicated the item on the Personnel Committee agend.a has been tabled. <br /> <br />Case #10A: Report from Public Works <br /> <br />1) Review Street Maintenance Program Projected Future Costs <br /> <br />Assistant Public Works Director Olson noted this item was discussed earlier in the agenda. The <br />City's current annual budget is $300,000. Although the City's share of this program averages <br />approximately $243,000 annually over the next six years, the projected expenditures for 2006 <br />and 2007 are roughly $100,000 higher than this average. It was discussed at the Public Works <br />meeting to try to look at the next 15 years or so and determine what they would need to gradually <br />increase that maintenance requirement or fund to get over the hump of the construction activity <br />that occurred in the 1975 to 1990 era. There was also a lot of discussion about what happens at <br />year 38 after there have been two sealcoats, an overlay, and two more sealcoats. This may be <br />getting to the point where reconstruction is needed, instead of just another overlay. There was <br />also discussion that the Master Development Agreement with Ramsey Town Center does not <br />include escrow funds for the first sealcoating of streets within the development. Staff was <br />directed to determine the cost of these sealcoating requirements. Staff has done some work on <br />that and will bring it back to a future Public Works meeting. The Public Works Committee also <br />directed staff to involve the Finance Director in discussions for setting up a street maintenance <br />flmd. <br /> <br />City Council/March 8, 2005 <br /> Page 15 of 18 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.