My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/02/2001
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2001
>
Agenda - Planning Commission - 01/02/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:25:20 AM
Creation date
5/14/2003 8:14:45 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/02/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The principal and accessory structures meet the front yard, rear yard, and side yard setbacks <br />established in the BW district. The Business Warehousing district restriCts lot coverage to 35%, <br />the site plan is proposing to construct a total of 59,936 square feet of building space on 11.24 <br />acres, which equates to approximately a 12.24% lot coverage. <br /> <br />City Code states that accessory structures shall not exceed 30% of the gross floor space of the <br />principal building. The site plan is proposing to construct a 20,000 square foot metal panel <br />accessory building, which equates to approximately 50% of the gross floor space of the principal <br />building. This is a deviation from City Code and will require City Council approval. The size <br />and proposed exterior materials of the accessory building is'part of a negotiated settlement . <br />between the City and Mr. Sauter in a recent land swap agreement for Sauter's property west of <br />Sunfish Lake Blvd. <br /> <br />The site will derive two (2) access points froTM the westerly extension of 141~t Avenue. <br /> <br />City Code requires all driveways and off-street parking areas to be paved and finished with B- <br />6/12 concrete curbing. The site plan indicates that the employee/customer parking area and an <br />area to the. north, east and west of the principal building will be surfaced with bituminous <br />pavement. The site plan is unclear as to whether or not the bituminous area will be finished with <br />the required concrete curbing. It is anticipated that the paved area will not be finished with <br />concrete curbing due to an agreement between the City and Mr. Sauter in a recent land' swap <br />settlement. Deviation from the required concrete curbing will require City Council approval. <br /> <br />The off-street parking area for trucks and equipment located to the north of the principal building <br />is proposing to be absent of the required bituminous pavement. The site plan is proposing to <br />surface the off-street parking area with Class II. This is a deviation from City Code and will <br />require City Council approval. Staff is recommending that this off-street parking area at a <br />minimum consist of Class V recycled aggregate surface. The City is constructing a pond to the <br />north and west of the subject property and the proposed Class II surface will permit more <br />migration of small particles into the pond and may overtime lessen the effectiveness of the pond. <br /> <br />The City Engineer is requesting that temporary and permanent erOsion control measures be taken <br />for-the proposed dirt storage area located along the western property line and the off-Street <br />parking areas that will be absent of bituminous pavement. <br /> <br />The exterior building materials for the principal structure are proposing to consist of pre-cast <br />concrete panels with a pre-finished metal fascia, this meets the architectural standards established <br />in the business district. The accessory building is proposing to consist of metal panels, this is a <br />deviation from City Code and will require City Council approval. <br /> <br />The proposed screening along the south, east and west property lines meet C!tY Code <br />requirements. <br /> <br />The landscaping plan is acceptable, Staff is requesting that additional fOundation plantings be <br />included around the principal structure. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.