My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/09/2020
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2020
>
Agenda - Planning Commission - 07/09/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:05:21 AM
Creation date
7/2/2020 4:19:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/09/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applicant Response <br />Updated By <br />Joe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe <br /> FeriancekJoe FeriancekJoe FeriancekJoe Feriancek <br />Markup Date <br />06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 <br /> 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM06/11/2020 1:54 PM <br />Changemark Details <br />Survey Info is blank.Shows removing pavement on the northern lot, doesn't appear anything is going back in place here. Suggest saving the funds Showing removing pavement off site, don't <br /> see the reason. Oppurtunity to save funds.Note D is blankShowing extra tree removal hatch off-site.Tree save fencing at edge of tree clearingMove so no linework behind scale/north arrow <br /> - improve readability.Street must be swept within 3 hours of notification from the City.cover disturbed areas within 7 days (project is within 1 mile of Mississippi River)Smooth out <br /> the grading contours south parking lot.Add more proposed contour labelsponds should have 10-foot wide maintenance/safety bench at the normal water levelcall out slope for ponds, 1:3.Call <br /> out the pond 100 HWL, NWL on the plans.northern parking lot showing flat grading, needs more positive drainage.is the parking lot curb tip out curb, with sheet flow towards the cb. <br /> The east side lowpoint needs tipout curb to not hold Flared Curb Outlets will need some perminent erosion control with them. I would consider a Rain Guardian with Updated Areas - site <br /> is much larger than being called out. <br />Changemark Subject <br />Survey InfoRemovals AreaOffsite RemovalsNote DExtra hatchTree Save FencingScale/North ArrowSweepingDisturbed Area coverageGrading ContoursProposed Contour Labelspond maintenance/safety <br /> benchslopePond ElevationsFlat areaVisitor Parking Lot CurbFlared Curb OutletsTotal Disturbed Area <br />Markup Name <br />JJFJJFJJFJJFJJFJJFJJFJJFJJFJJFJJFJJFJJFJJFJJFJJFJJFJJF <br />File <br />ARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey <br /> PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte <br /> Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Rams <br />ey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte Submittal.pdfARCH_Ramsey PW_2020.06.03_SIte <br /> Submittal.pdf <br />Snapshot <br />Department <br />Civil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer <br /> IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer II <br />Status <br />Public Works Campus04/16/2020 3:22 PM06/19/2020 10:58 AM <br />UnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolved <br />Complete? <br />FalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalse <br />222222222222222222 <br />Cycle <br />Changemarks Report <br />Project Name: Workflow Started: Report Generated: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.