My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/14/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 07/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:51:28 PM
Creation date
7/20/2020 9:42:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/14/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City is proposing a franchise fee of $7.00 per utility, or $14.00 per month on residential <br />users that have both electric and gas utilities. This would equate to $168.00 per year for residents <br />connected to both gas and electric utilities. Commercial/Industrial users are proposed to be <br />charged a per meter fee based on meter size. Most churches are proposed to be charged $20 per <br />month ($10 per utility), which is the same as a small commercial fee. See attached franchise fee <br />rate sheet for more detail. <br />There will be no more than one gas and one electric franchise fee charged per address. If a <br />property was to contain more the one meter, example: commercial properties, the franchise fee <br />will be calculated based off of the largest meter only. <br />The following terms and conditions were incorporated into the attached draft ordinances based <br />on input from the City Council: <br />• Collected franchise fees can only be spent on Pavement Management Program projects. <br />• Collected Fees will be deposited into a committed fund - "Pavement Management Program Fund" <br />• Annual review by City Council of franchise fees collected, funds expended and balance remaining in <br />Pavement Management Program Fund <br />• Rebate Program - Discussed below <br />• A 5-Year sunset term on all ordinances to allow a thorough review of revenues versus expenditures, to <br />consider other potential funding sources in the future, and to make adjustments as desired or needed. <br />A rebate program is proposed that will return the annual franchise fee to those have been <br />assessed since 2015. The rebate program will apply to those currently paying an assessment on a <br />street reconstruction or overlay project that was levied, starting in 2015 (first year of city's <br />Pavement Management Program), or who paid their assessment upfront (prepaid) and would <br />otherwise still be paying an assessment. The rebate would be capped at the lesser of the annual <br />assessment amount or annual franchise fees paid. The rebate is no longer eligible if a property <br />has been sold since the assessment was levied. Homeowners will need to apply for the rebate <br />annually. See attached franchise fee rebates summary. <br />Notification: <br />Public Hearing notifications for July 14, 2020 were published in the Anoka Union on June 26 and July 3. L Letters <br />were also sent out to Connexus Energy, Centerpoint Energy & City of Anoka Electric on June 11, 2020 notifying <br />them of the city's intention of adopting a franchise fee. <br />Observations/Alternatives: <br />The following is the Proposed Franchise Fee Adoption Schedule: <br />May 12, 2020 WS Consensus of Council directed staff to bring forward franchise fee option. <br />June 9, 2020 WS Council reviews draft ordinances with proposed franchise fee rates and <br />terms. Consensus was a $7 per month per utility for residential and <br />commercial properties would be charged a fee for each respective utility <br />based on meter size (if more than one meter, largest meter would be used <br />to determine fee. <br />June 11, 2020 Letters to Connexus Energy, City of Anoka, and Centerpoint Energy <br />notifying of intention of City to introduce a Franchise Fee Ordinance. <br />June 23, 2020 CC Motion Calling for a Public Hearing on the Proposed Franchise Fee <br />
The URL can be used to link to this page
Your browser does not support the video tag.