Laserfiche WebLink
As with all public improvement projects completed in the City of Ramsey, a project web page will be maintained <br />on the City web site throughout construction. <br />The proposed improvements should have a serviceable life of 60 years, assuming that proactive maintenance <br />operations are performed on a regular basis during the life of the improvements. <br />Alternatives: <br />(This section was updated June l9th after opening bids.) <br />Alternative #1— Motion to adopt Resolution #20-130 accepting bids and awarding a construction Contract to <br />Douglas -Kerr Underground, L.L.C. from Mora, MN in the amount of $622,062.11 for Puma Street Improvements, <br />Improvement Project #20-04. <br />Alternative #2 — Motion to deny adoption of Resolution #20-130 at this time. <br />Funding Source: <br />(This section was updated June 19th after opening bids.) <br />On June 19, 2020, a total of twelve bids were received, opened, and tabulated, and the following bids were found to <br />comply with the advertisement for bids. <br />CONTRACTOR <br />TOTAL BID <br />Douglas -Kerr Underground, L.L.C. <br />$622,062.11 <br />RL Larson Excavating Inc. <br />$622,331.01 <br />North Pine Aggregate, Inc. <br />$642,343.50 <br />Northern Lines Contracting <br />$649,157.90 <br />Ryan Contracting Co. <br />$667,847.00 <br />Kuechle Underground Inc. <br />$693,849.10 <br />New Look Contracting, Inc. <br />$712,047.00 <br />Meyer Contracting Inc. <br />$723,640.20 <br />Northwest <br />$737,744.31 <br />Geislinger & Sons <br />$741,925.50 <br />Park Construction Company <br />$745,488.60 <br />Peterson Companies <br />$750,997.15 <br />Engineer's Estimate <br />$813, 760.00 <br />The bid of Douglas -Kerr Underground, L.L.C. of Mora, Minnesota, in the amount of $622,062.11 for the total bid <br />for construction of said improvements in accordance with the approved plans and specifications and advertisement <br />for bids, is the lowest responsible bidder. Adding indirect costs in the amount of 25-percent for administrative, <br />engineering, finance and legal costs brings the total project costs to $777,577.64. <br />The low bid is 30.8% less than the engineer's estimate, primarily due to lower than estimated mobilization and <br />dewatering bid prices. <br />An engineering services proposal was previously secured from Bolton & Menk on March 17, 2020, which included <br />a not -to -exceed fee of $8,930 for construction administration and staking. A copy of this proposal is attached. Since <br />these services cannot be provided in-house they must be contracted out, and since Bolton & Menk is the design <br />engineer they are best equipped to stake construction and assist with construction administration. <br />Project Funding <br />Based on previous direction, project costs are proposed to be funded in part by the City, in part by Capstone <br />Homes, and in part by AKM Farms/Paxmar. The proposed cost contributions are outlined in the attached cost share <br />model. The City is proposed to contribute to the costs since the City owns 4 acres of real property fronting Puma <br />Street, and since Puma Street is a collector street on our Municipal State Aid System. <br />