My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/10/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 08/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:52:39 PM
Creation date
8/10/2020 2:30:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTHERN <br />Nisassmoof TECHNOLOGIES. <br />CH NOLOLOGPf S, Li <br />NT <br />Table 1 - Estimate of Fees <br />Ramsey Municipal Plaza <br />Ramsey, Minnesota <br />Estimated Units <br />Unit Cost Estimated Fee <br />Excavation Observations and Testing Services for Earthwork Construction <br />Excavation Observations - Proposed New Building Construction <br />Project Engineer - Soils (Assumes 2 Visits) <br />Engineering Assistant - Soils <br />3 <br />$130.00 per hour <br />$80.00 per hour <br />Earthwork Testing and Observations - Assumes 8000CY of Material and Small Amount to get to Native for Building <br />Project Engineer $130.00 per hour <br />Engineering Technician - Soils (Assumes 10 Visits) 15 $65.00 per hour <br />Density Test Nuclear Method (ASTM D6938) 60 $20.00 per test <br />Standard Proctor (ASTM D698) 2 $135.00 per test <br />Mechanical Analysis: 1-1/2" to #200 & wash Cohesive/Granular Soils (ASTM C136/C117) 2 $125.00 per test <br />Moisture Content (ASTM D2216) $25.00 per test <br />Organic Content of Soil (ASTM D2974) $45.00 per test <br />Topsoil Testing (All Inclusive) $260.00 per sample <br />Vehicle Mileage - 12 Total Visits <br />60 <br />S390.00 <br />$975.00 <br />$1,200.00 <br />$270.00 <br />$250.00 <br />$0.80 per mile $48.00 <br />Section Total <br />Services for Engineering Consulting, Construction Meetings, and Project Management <br />Subtotal $3,133.00 <br />Engineering Assistant <br />Engineer/Project Manager <br />Principal Engineer <br />Senior Engineer <br />Assistant Project Management <br />3 <br />3 <br />$80.00 per hour <br />$130.00 per hour <br />$195.00 per hour <br />$155.00 per hour <br />$55.00 per hour <br />$240.00 <br />$390.00 <br />Section Total <br />Summary of Services <br />Subtotal $630.00 <br />Excavation Observations and Testing Services for Earthwork Construction <br />Services for Engineering Consulting, Construction Meetings, and Project Management <br />$3,133.00 <br />$630.00 <br />ESTIMATED PROJECT FEES <br />$3,763.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.