My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/10/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 08/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:52:39 PM
Creation date
8/10/2020 2:30:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: 08/10/2020 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />5.6. <br />Information <br />Title <br />Adopt Resolution #20-165 Approving Change Order #1 for Variolite Street Reconstruction, Improvement Project <br />20-01. <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #20-165 approving Change Order #1 for Variolite Street <br />Reconstruction, Improvement Project 20-01. <br />Background: <br />Included in the Variolite Street Reconstruction project is the replacement of existing 10" force main trunk sanitary <br />sewer with 21" PVC gravity trunk sanitary sewer along Variolite Street between 163 rd Avenue and 166th Avenue, <br />a distance of approximately 2,360 feet. <br />The new trunk sanitary sewer is proposed to allow for future expansion of the sanitary sewer system to the north. <br />After staking the proposed end of line stub, City Staff found that installing the sanitary sewer stub as proposed <br />would impact existing trees, landscaping and existing high pressure gas mains, and that future connections made to <br />the sanitary sewer stub would require several hundred feet of Variolite Street to be reconstructed. To avoid such <br />existing and future impacts, this change order proposes to extend the 21" PVC sanitary sewer 160 lineal feet and to <br />add an additional manhole to the north. The sanitary sewer stub out of the last manhole is directed into the east <br />ditch, beyond the tree impact area, far enough off Variolite Street to avoid future impacts to the street and existing <br />gas mains, which would cost significantly more than extending the sanitary sewer 160 feet to the north. <br />In addition, after award of the contract, City Staff was contacted by the residents at 7600 163rd Lane with an <br />inquiry to connect to city sewer and water. This change order includes the necessary work to extend 1" water <br />service and 4" sanitary sewer service lines to the right of way at 7600 163 rd Lane NW, which the property owner <br />can then connect to. <br />Park Construction plans to begin installing sanitary sewer on Wednesday, August 12, 2020. The work required to <br />provide City utility service lines for 7600 163rd Lane NW are near the beginning point of sanitary sewer <br />construction, therefore approval of Change Order #1 must occur before August 12th in order to ensure that Council <br />approval is received before work associated with Change Order #1 begins. Whenever possible, Staff requests <br />Council approval of Change Orders prior to authorizing any associated work. <br />A petition and waiver agreement for the connection to City sewer and water services is considered under a separate <br />case on the consent agenda. <br />Notification: <br />No notifications are required. <br />Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.