My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 08/18/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 08/18/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:29:03 AM
Creation date
8/14/2020 4:05:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
08/18/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Staff will provide a comprehensive update on this project in Oct. or Nov. <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Proposed for construction 2022 - 2024 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />• Proposed for construction 2022 - 2024 <br />• Preliminary design on hold <br />• MnDOT exploring realignment of Highway 47 to remove S-curve <br />• Requires relocation of Alter Recycling...still in discussions <br />• Rum River Bridge Replacement <br />• MnDOT requested funding to replace bridge in 2022 - 2024 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• NW Metro Surface Water Supply Feasibility Study <br />• Member cities include Corcoran, Dayton, Ramsey and Rogers <br />• MCES is funding 100% using Clean Water Funds <br />• Final study completion anticipated September 2020 <br />• City of Ramsey Centralized Water Treatment Facility Study <br />• Water System Model — Complete <br />• Source Water Analysis — Complete <br />• Toured Andover and Brooklyn Center WTF's <br />• Feasibility Study — Final draft under review <br />• Ramsey Gateway Highway 10 Improvements <br />• Final design (Ramsey Blvd. and Sunfish Lake Blvd. improvements) underway <br />• Anoka County awarded $40M <br />• NW Metro Mississippi River Crossing Feasibility Analysis (NEW) <br />• No updates at this time <br />• TH 47 Safety Study (NEW) <br />• No updates at this time <br />• Reduced Speed Limits on Local Streets <br />• No new requests received since last discussed <br />• Monitoring discussions in Minneapolis and Saint Paul <br />Timeframe: <br />Staff estimates up to 20 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />NA <br />Funding Source: <br />NA <br />Recommendation: <br />NA <br />Action: <br />No formal action required. For Committee review and discussion purposes only. <br />
The URL can be used to link to this page
Your browser does not support the video tag.