My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 08/18/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 08/18/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:29:03 AM
Creation date
8/14/2020 4:05:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
08/18/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
There was none. <br />6. COMMITTEE / STAFF INPUT <br />6.01: Staff Updates on Improvement Projects and Items of Interest <br />City Engineer Westby provided a brief update on current and proposed City, County and MnDOT <br />improvement projects, studies and other items of interest to the Committee. <br />Councilmember Riley asked when staff begins planning for the projects for the next year, to ensure <br />that all projects can be completed. <br />City Engineer Westby stated that staff has already begun collecting survey data on Riverdale Drive <br />between Sunfish Lake Boulevard and Feldspar Street, which is designated for reconstruction in <br />2021 per the current Capital Improvement Plan. However, City Engineer Westby reminded the <br />Committee that Staff plans to complete a comprehensive revision of the CIP this summer based <br />on the ground penetrating radar data recently received, which may need to be augmented with data <br />from additional pavement cores. <br />Councilmember Riley referenced 167th, which is in bad shape, and asked when that road is <br />scheduled for repair. <br />City Engineer Westby replied that 167th Avenue was previously scheduled for a mill and overlay <br />in 2027 or 2028, but is now past the point of a mill and overlay and may be moved up to a full <br />reconstruction in 2022 or 2023. <br />Councilmember Riley referenced the segment of Waco between Sunwood and 150th and asked if <br />there is an answer for repairing that segment. <br />City Engineer Westby stated that he has spoken with residents in that area in the past and provided <br />information to one resident on how residents could move that project forward through the petition <br />process. He stated that segment is very wide and therefore if reconstructed, could be narrowed to <br />match the widths of the adjacent segments. He stated that there is no reason the segment has not <br />been reconstructed, outside of the fact that there are roads in worse shape. <br />Chairperson Kuzma stated that perhaps funds could be found to complete that one block. <br />City Engineer Westby replied that it is on the radar of staff and will be considered while revising <br />the CIP this summer. <br />6.02: Review Future Topics Calendar <br />City Engineer Westby highlighted the future topics calendar. <br />7. ADJOURNMENT <br />Public Works Committee / July 21, 2020 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.