My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/10/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 05/10/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:48:57 PM
Creation date
5/9/2005 9:27:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/10/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIN:~.NCING <br /> <br />In addition to construction cost, overhead charges of twenty-two percent (22%) will be applied to <br />cover the fbi]owing services: <br /> <br />Engineering and Inspection <br />City Staff Administration <br />Bonding and Legal <br />Contingencies <br /> <br />10% <br /> 5% <br /> 2% <br /> 5% <br /> <br />It is the City's policy to assess property owners fifty percent (50%) of the total project cost of the <br />improvements for projects associated with the annual street maintenance pro~am. Properties are <br />assessed equally regardless of fi'ont footages or property size, since comer lots and cul-de-sac <br />Iots~ which are common within the City, would receive widely disparate assessments. Since <br />projects are generally classified by subdivisions which have similar characteristics and lot sizes, <br />it is ~'clt that there is a fair apportionment of project costs when assessed equally within the <br />imtividuat subdivisions. <br /> <br />Ta. bl~~. 5 contains the distribution of costs between the City and the benefited parties. A listing of <br />benefited properties are listed in the preliminary assessment role contained in Appendix B. The <br />costs contained Within this report are estimated costs. The projects will have a final tabulation <br />made on actual project costs consistent with the methodology described in this report. A public <br />hearing will be held identifying the actual costs to be recovered by special assessment. Each- <br />property may, at any time prior to certification of the assessment to the 'County Auditor, pay the <br />whol~ of the assessment on such property, with interest, except that no interest shall be charged <br />iF the entire assessment is pa'id within 30 days from the adoption of the assessment resolUtion. <br />Special assessments reported to Anoka County shall be payable over a three-year period for <br />,qealcoating projects, and over a ten-year period for bituminous overlaying projects, with interest <br />at ~ rate of two percent (2%) above the U.S. Treasury rate at the time of the special assessment <br />hearing. <br /> <br />PROJECTED PROJECT SCHEDULE <br /> <br />.,5 schedule for the milestones associated with this project is presented in Table'6.. <br /> <br />-155- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.