Laserfiche WebLink
Background: <br /> <br />RECEIVE TRAFFIC VOLUME INFORMATION FOR <br />MALLARD PONDS - FLINTWOOD HILLS AREA <br />By:Steven Jankowski, City Engineer <br /> <br />CASE <br /> <br />At the January l 8, 2005 Public Works Committee meeting it was explained that the <br />closure of Barium Street, a private roadway accessing onto CR 116 was anticipated as an <br />element of the County road project scheduled to take place this fall which would upgrade <br />the segment of CR 116 fi.om TH 47 to Germanium Street as a four lane divided h/ghway. <br />There was support for the closure of Barium Street onto CR 116 from both the residents <br />of the Mallard Ponds subdivision and the City. However the closure of Barium Street <br />would leave the Mallard Ponds subdivision with a single access point at 140th Avenue. <br />The consensus of the Public Works Committee was that there needs to be more than one <br />access into this subdivision. There was also direction to staff to research the feasibility of <br />closing the connection of 142nd Avenue between Argon Street and TH 47, such that the <br />emergency gate access on the south end of Argon Street might be removed and thereby' <br />provide a second access point to the Mallard Ponds subdivision. <br /> <br />In an effort to begin an analysis of the traffic impacts that any changes may cause it is <br />important to establish a sound backg"round of the current traffic patterns within.the area. <br />After consultation with a traffic engineer, traffic counter were set out at the locations <br />identified on the attached exhibit. A complete summary'of these traffic counts will be <br />made available at the Committee meeting. <br /> <br />hq evaluating the magnitude of the traffic impacts, a next logical st,e~ would be to <br />temporarily modify the street system in the area by (a) closing 142 Avenue east of <br />Argon Street; (b) opening the gate at the south end of Argon Street; and (c) barricading <br />the access of Barium Street onto CR 116. <br /> <br />The opening of the gate at Argon Street will involve the cooperation with the one of the <br />two Mallard Pond townhome associations, A number of residents of the Mallard Ponds <br />subdivision expressed serious concern over the permanent opening of the gated access on <br />Argon Street, and the Flint'wood neighborhood to the north would also be affected..It is <br />therefore important that a forum for public involvement be established in addressing this <br />proposal. Perhaps, an ad hoc committee of residents might be formed to work with staff <br />on identifying specific concerns and how they might, be addressed. It would also be <br />advisable to prepare a newsletter outlining the proposed modifications and process. <br /> <br />Recommendation: <br /> <br />Staff recommends that it be directed to contact the townhouse association to.request the <br />temporary opening of the Argon Street gate which would be done in conjunction with the <br />temporary closure of 147a Avenue east of Argon Street and the barricading of Barium <br /> <br />-427-57 <br /> <br /> <br />