Laserfiche WebLink
storefront, and rockface block in two colors for the main siding of the building. The building has a red front <br />entrance area with tan and brown walls. <br />Funding Source: <br />Staff is handling this update as part of regular duties. The Applicant will be responsible for all costs associated with <br />review once there is a formal application in place. <br />Recommendation: <br />Provide the Developer high level feedback and identify any red flags on the proposed site plan. <br />Action: <br />No formal action required. This case is meant as an update only and to allow the Developer to receive feedback <br />from Staff and the Planning Commission prior to drawing up formal engineering plans. <br />Site Location <br />Letter of Intent <br />Elevations <br />Elevations and Floor Plan <br />Site Plan <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Sean Sullivan Sean Sullivan 08/24/2020 01:07 PM <br />Kurt Ulrich Kurt Ulrich 08/24/2020 01:12 PM <br />Tim Gladhill Brian McCann 08/28/2020 01:39 PM <br />Form Started By: Chloe McGuire Brigl Started On: 08/21/2020 02:46 PM <br />Final Approval Date: 08/28/2020 <br />