Laserfiche WebLink
The cost of capping the 4" service ($3,930.00 referenced in Mr. Johnson's letters) consists of <br />$2,100 for capping the 4" service, $1,430 for dewatering, and $101 for the permit to connect to <br />the City water supply. According to a conversation ~vith the Contractor that performed the work, <br />there was an error for the balance. The civil plan that was approved stated, "If existing 4" water <br />service is not used, salvage and remove 4" DIP, 4" PLUG, and 4" Gate valve and box back to <br />mainline tee and tie 4" plug to tee." The dewatering would have had to be completed regardless <br />and therefore should not be the City's responsibility. The permit fee would have been the same <br />regardless of whether the 4" service was needed or not so should also not be the City's <br />responsibility. <br /> <br />Committee Action: <br /> <br />Based upon discussion <br /> <br />Reviewed by: <br />City Administrator <br />Director of Public Works <br /> <br />PW: 2/20/00 <br /> <br /> <br />