My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/15/2001
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2001
>
Agenda - Public Works Committee - 05/15/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:46:40 PM
Creation date
5/14/2003 2:45:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/15/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UPDATE ON TRUNK HIGHWAY #47 STP <br />By: Steve Jankowski, City Engineer <br /> <br />P.W. CASE #: 1 <br /> <br />Background: <br /> <br />Construction on Trunk Highway #47 was halted last fall with thc close of the <br />construction season. Work has begun again in early April 2001 for the completion of this <br />project. This case is intended to update the Committee on the status of issues associated <br />with the completion of this project. <br /> <br />Construction of screening wall: <br /> <br />After the grading of the highway was completed, it became evident that long sections of <br />the new highway been raised several feet creating a visual and noise impact to adjacent <br />residences on the east side of the highway. To remedy this impact there was consensus <br />that a six-foot high wooden screening wall be constructed atop a three-foot high berm. <br />The construction on this was completed in April. Supplemental agreement No. 3 <br />attached provides a change order in the amount of $254,313.06 for the construction of the <br />wall. This latest estimate compares to an estimate of $217,000 that was presented to the <br />Council in a memo dates October 24, 2000. The final actual quantities should be <br />available within several weeks. <br /> <br />Committee Action: <br /> <br />Motion to recommend entering into Supplemental Agreement No. 3 authorizing change <br />order in the amount of $254,313.06. <br /> <br />Turf restoration, landscaping, and miscellaneous work: <br /> <br />Work began in late April on'the completion of remaining work this primarily involves the <br />restoration of turf, the placement of trees, and repair of irrigation systems, however it also <br />included minor concrete and bituminous work. The landscaping work is approximately <br />90% complete at the time of this writing. Completion is expected by Memorial Day. <br /> <br />Also of note is that the Mn Partnership Planting is to take place May 19, 2001. This <br />planting will place shrubs and perennials along the base of the sound wall, around the <br />ponds at Lord of Life Church and north of Sunwood Drive and at Trott Brook Cemetery. <br />This is not part of the Trunk Highway #47 budget. MnDot will pay for the plant <br />materials and will provide traffic control, wood chips and traffic vests for the 50 <br />volunteers currently signed up. The City staff will assist with hole preparation, plant <br />staking and usage of the water truck. <br /> <br />Committee Action: <br /> <br />None required. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.