Laserfiche WebLink
3. The State, with its own.resOurces or by contract, <br />will perform the Traffic Control Signal and EVP System work <br />pursuant to the plans and specifications for State Project <br />No. 0206-55 with the Construction Costs shared as follows: <br /> <br /> a. Trunk Highway No. 47 at Co. Rd. 30/Pleasant <br /> <br /> Street. System "A". Traffic Control Signal <br /> and EVP System. Estimated Construction Cost <br /> is $127,200.00 which includes a lump sum <br /> amount of $20,200.00 for State Furnished <br /> Materials. State share is 50 percent. County <br /> share is 25 percent. Anoka share is 25 <br /> percent. <br /> <br /> b. Trunk Highway No. 47 at Trunk Highway 10, <br /> North Ramp. System "B". Traffic Control <br /> Signal and EVP System. Estimated <br /> Construction Cost is $156,400.00 which <br /> includes a lump sum amount of'$26,400.00 for <br /> State Furnished Materials. State share is <br /> 100 percent. <br /> <br /> c. Trunk Highway No. 47 at Trunk Highway-10, <br /> South Ramp. System "C". Traffic Control <br /> Signal and EVP System. Estimated <br /> Construction Cost is $155,200.00 which <br /> includes a lump sum amount of $20i200.00 for <br /> <br />87957R <br /> <br />27 <br /> <br /> <br />