Laserfiche WebLink
Puma Street, and Riverstone 4th Addition by Capstone Homes on the west side. Exhibits showing the location and <br />scope of each development are attached to this case. <br />This spring Capstone Homes began development of Riverstone 4th Addition located on the north half of the <br />Riverstone residential development, west of Puma Street. Currently there are no plans to begin construction of the <br />Alpha/AKM Farms development, east of Puma Street. <br />Streets and Trails <br />Approximately 1,000 feet of Puma Street and the adjacent regional trail south of Alpine Drive were realigned and <br />reconstructed to replace the existing temporary street section with a permanent street section including bituminous <br />pavement, concrete curb and gutter, storm sewer, and associated appurtenant improvements. <br />All street, storm sewer and trail improvements meet all applicable State Aid standards including curb and gutter <br />design, pavement structural capacity, horizontal and vertical curves, lane and shoulder widths, and clear zones. <br />Puma Street meets a 9-ton all-weather pavement design. <br />Trunk Watermain <br />Trunk 16-inch ductile iron pipe watermain was extended north along Puma Street to Alpine Drive to serve the <br />Riverstone 4th Addition and the Alpha/AKM Farms development with water, and to ultimately provide a looped <br />watermain system along Puma Street and Alpine Drive. Looped watermain will more reliably serve properties in the <br />area, provide better fire flows, and provide better water quality by removing a dead end. Alpine Drive is scheduled <br />to be reconstructed in 2025 per the City's current Capital Improvement Program (CIP). At that time, trunk <br />watermain will be extended along Alpine Drive to connect the existing trunk watermain running parallel to <br />Armstrong Boulevard to the watermain installed under Puma Street with this project. <br />Trunk Sanitary Sewer <br />Trunk 8-inch poly -vinyl chloride sanitary sewer was extended north along Puma Street to serve the Riverstone 4th <br />Addition and the Alpha/AKM Farms development with sanitary sewer. The sewer is not designed to serve <br />properties north of Alpine Drive with municipal sewer. Those properties can be served in the future, if needed, from <br />a proposed trunk sewer line along Armstrong Boulevard. <br />Storm Sewer <br />The Puma Street improvements included construction of a permanent urban street section with concrete curb and <br />gutter and storm sewer improvements, including connections to an adjacent stormwater pond in the Riverstone <br />development. <br />Public Comment <br />AKM Farms/Paxmar has stated that they are not supportive of being assessed at this time via emails. All public <br />comments received prior to the Assessment Hearing will be presented to the City Council before the Assessment <br />Hearing is opened. <br />Notification: <br />Following Council approval, an Assessment Hearing Notice will be published in the City's official newspaper on <br />Friday, September 25, 2020. Assessment Hearing Notices will also be mailed to all benefiting property owners as <br />required by State Statute. <br />Anoka County requires that assessments be certified to the County Auditor by November 16, 2020 for collection on <br />next year's (2021) taxes. November 16, 2020 will therefore be the last day that assessed property owners can <br />prepay their special assessments without paying interest. Conducting the Assessment Hearing at the regular City <br />Council meeting on October 13, 2020, will therefore allow more than 30 days for mailing the required assessment <br />notices to property owners. <br />Funding Source: <br />