Laserfiche WebLink
ST <br />CONSTRUCTION <br />ESTIMATE DATE: September 2, 2020 <br />PROJECT: City of Ramsey Public Works <br />ARCHITECT: Oertel <br />DRAWING DATE: July 29, 2020 <br />DESCRIPTION <br />Sub Contractors <br />Previous <br />Estimate <br />BP #1 <br />Estimate <br />$/sf <br />86,018 <br />Difference <br />Construction Costs <br />1A - Special Inspections <br />Intertek PSI <br />$52,800 <br />$36,682 <br />$0.43 <br />($16,118) <br />1B - Surveying <br />Hakanson Anderson <br />$24,000 <br />$22,160 <br />$0.26 <br />($1,840) <br />1C - Final Cleaning <br />0 <br />$80,646 <br />$80,646 <br />$0.94 <br />$0 <br />3A - Cast -in -Place Concrete <br />Northland Concrete and Masonry <br />$950,000 <br />$1,194,000 <br />$13.88 <br />$244,000 <br />3B - Precast Structural & Architectural Concrete <br />Moline <br />$1,949,998 <br />$1,379,458 <br />$16.04 <br />($570,540) <br />3C - Polished and Sealed Concrete <br />0 <br />$75,445 <br />$75,445 <br />$0.88 <br />$0 <br />4A - Unit Masonry <br />Steenburg Watrud <br />$374,677 <br />$213,240 <br />$2.48 <br />($161,437) <br />5A - Structural Steel/Misc. Metals - Material <br />Thorneburg Steel <br />$760,400 <br />$754,161 <br />$8.77 <br />($6,239) <br />5B - Structural Steel & Misc. Metals - Erection <br />MetCon Construction <br />$249,700 <br />$249,000 <br />$2.89 <br />($700) <br />6A - Carpentry Materials and Install <br />0 <br />$163,400 <br />$163,400 <br />$1.90 <br />$0 <br />7A - Waterproofing & Weatherproofing <br />Herzog Coatings <br />$152,980 <br />$41,000 <br />$0.48 <br />($111,980) <br />7B - Architectural Metal Panels <br />0 <br />$336,000 <br />$336,000 <br />$3.91 <br />$0 <br />7C - EPDM Roofing <br />0 <br />$804,092 <br />$804,092 <br />$9.35 <br />$0 <br />7D -Joint Sealants <br />0 <br />$56,650 <br />$56,650 <br />$0.66 <br />$0 <br />8A - Doors, Frames and Hardware - Materials <br />0 <br />$135,133 <br />$135,133 <br />$1.57 <br />$0 <br />8B - Overhead Coiling Doors <br />0 <br />$27,236 <br />$27,236 <br />$0.32 <br />$0 <br />8C - Accordian Security Doors <br />0 <br />$44,500 <br />$44,500 <br />$0.52 <br />$0 <br />8D - Sectional Overhead Doors <br />0 <br />$195,500 <br />$195,500 <br />$2.27 <br />$0 <br />8E - Aluminum Framed Storefronts & Entrances <br />0 <br />$170,700 <br />$170,700 <br />$1.98 <br />$0 <br />8F - Translucent Wall Panels <br />0 <br />$73,900 <br />$73,900 <br />$0.86 <br />$0 <br />9A - Gypsum Board Assemblies <br />0 <br />$189,635 <br />$189,635 <br />$2.20 <br />$0 <br />9B - Tiling <br />0 <br />$45,515 <br />$45,515 <br />$0.53 <br />$0 <br />9C - Acoustical Ceilings <br />0 <br />$38,140 <br />$38,140 <br />$0.44 <br />$0 <br />9D - Carpet and Resilient Base <br />0 <br />$9,535 <br />$9,535 <br />$0.11 <br />$0 <br />9E - Painting <br />0 <br />$200,519 <br />$200,519 <br />$2.33 <br />$0 <br />10A - Signage <br />0 <br />$0 <br />$0 <br />$0.00 <br />$0 <br />10B - Specialties Materials <br />0 <br />$27,817 <br />$27,817 <br />$0.32 <br />$0 <br />10C - Lockers <br />0 <br />$20,526 <br />$20,526 <br />$0.24 <br />$0 <br />10D - Operable Partitions <br />0 <br />$18,089 <br />$18,089 <br />$0.21 <br />$0 <br />11A - Vehicle Wash Equipment <br />0 <br />$50,472 <br />$50,472 <br />$0.59 <br />$0 <br />11B - Vehicle Fueling System <br />0 <br />$590,000 <br />$590,000 <br />$6.86 <br />$0 <br />12A - Window Treatments <br />0 <br />$14,760 <br />$14,760 <br />$0.17 <br />$0 <br />12B - Casework Materials <br />0 <br />$55,739 <br />$55,739 <br />$0.65 <br />$0 <br />14A - Vehicle Lifts <br />Midwest Lift Works <br />$355,323 <br />$281,054 <br />$3.27 <br />($74,269) <br />21A - Fire Supression Systems <br />0 <br />$177,900 <br />$177,900 <br />$2.07 <br />$0 <br />22A - Plumbing Systems <br />0 <br />$1,083,000 <br />$1,083,000 <br />$12.59 <br />$0 <br />23A - HVAC Systems <br />0 <br />$1,508,500 <br />$1,508,500 <br />$17.54 <br />$0 <br />26A - Electrical Systems <br />0 <br />$1,250,000 <br />$1,250,000 <br />$14.53 <br />$0 <br />31A - Earthwork <br />MUE <br />$889,453 <br />$636,549 <br />$7.40 <br />($252,904) <br />32A - Asphalt Paving <br />Northland Paving <br />$592,000 <br />$619,000 <br />$7.20 <br />$27,000 <br />32B - Concrete Paving <br />Stapf Concrete Construction <br />$168,065 <br />$124,900 <br />$1.45 <br />($43,165) <br />32C - Fences and Gates <br />0 <br />$240,386 <br />$240,386 <br />$2.79 <br />$0 <br />32D - Landscaping <br />0 <br />$152,045 <br />$152,045 <br />$1.77 <br />$0 <br />33A - Utilities <br />Jacon <br />$469,228 <br />$503,809 <br />$5.86 <br />$34,581 <br />41A - Overhead Crane System <br />Aero Material Handling <br />$92,500 <br />$83,348 <br />$0.97 <br />($9,152) <br />