My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/08/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 09/08/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:04:57 PM
Creation date
9/9/2020 12:32:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/08/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ST <br />CONSTRUCTION <br />Description <br />BP #1 <br />Estimate <br />Previous <br />Estimate <br />Difference <br />Alternates <br />1A - Special Inspections <br />$0 <br />$0 <br />$0 <br />1B - Surveying <br />$0 <br />$0 <br />$0 <br />1C - Final Cleaning <br />$0 <br />$4,653 <br />($4,653) <br />3A - Cast -in -Place Concrete <br />$153,350 <br />$122,350 <br />$31,000 <br />3B - Precast Structural & Architectural Concrete <br />$176,000 <br />$148,333 <br />$27,667 <br />3C - Polished and Sealed Concrete <br />$3,013 <br />$3,013 <br />$0 <br />4A - Unit Masonry <br />$0 <br />$0 <br />$0 <br />5A - Structural Steel/Misc. Metals - Material <br />$64,000 <br />$50,000 <br />$14,000 <br />5B - Structural Steel & Misc. Metals - Erection <br />$34,000 <br />$51,000 <br />($17,000) <br />6A - Carpentry Materials and Install <br />$0 <br />$8,435 <br />($8,435) <br />7A - Waterproofing & Weatherproofing <br />$3,000 <br />$17,173 <br />($14,173) <br />7B - Architectural Metal Panels <br />$0 <br />$0 <br />$0 <br />7C - EPDM Roofing <br />$118,347 <br />$118,347 <br />$0 <br />7D -Joint Sealants <br />$3,013 <br />$3,013 <br />$0 <br />8A - Doors, Frames and Hardware - Materials <br />$0 <br />$0 <br />$0 <br />8B - Overhead Coiling Doors <br />$0 <br />$0 <br />$0 <br />8C - Accordian Security Doors <br />$0 <br />$0 <br />$0 <br />8D - Sectional Overhead Doors <br />$0 <br />$0 <br />$0 <br />8E - Aluminum Framed Storefronts & Entrances <br />$0 <br />$0 <br />$0 <br />8F - Translucent Wall Panels <br />$0 <br />$0 <br />$0 <br />9A - Gypsum Board Assemblies <br />$0 <br />$0 <br />$0 <br />9B - Tiling <br />$0 <br />$0 <br />$0 <br />9C - Acoustical Ceilings <br />$0 <br />$0 <br />$0 <br />9D - Carpet and Resilient Base <br />$0 <br />$0 <br />$0 <br />9E - Painting <br />$54,630 <br />$54,630 <br />$0 <br />10A - Signage <br />$0 <br />$0 <br />$0 <br />10B - Specialties Materials <br />$0 <br />$0 <br />$0 <br />10C - Lockers <br />$0 <br />$0 <br />$0 <br />10D - Operable Partitions <br />$0 <br />$0 <br />$0 <br />11A - Vehicle Wash Equipment <br />$0 <br />$0 <br />$0 <br />11B - Vehicle Fueling System <br />$0 <br />$0 <br />$0 <br />12A - Window Treatments <br />$0 <br />$0 <br />$0 <br />12B - Casework Materials <br />$0 <br />$0 <br />$0 <br />14A - Vehicle Lifts <br />$0 <br />$0 <br />$0 <br />21A - Fire Supression Systems <br />$23,940 <br />$23,940 <br />$0 <br />22A - Plumbing Systems <br />$87,500 <br />$87,500 <br />$0 <br />23A - HVAC Systems <br />$204,867 <br />$204,867 <br />$0 <br />26A - Electrical Systems <br />$168,714 <br />$168,714 <br />$0 <br />31A - Earthwork <br />$12,439 <br />$27,080 <br />($14,641) <br />32A - Asphalt Paving <br />($22,000) <br />($32,669) <br />$10,669 <br />32B - Concrete Paving <br />$0 <br />$1,000 <br />($1,000) <br />32C - Fences and Gates <br />$0 <br />$0 <br />$0 <br />32D - Landscaping <br />$0 <br />$0 <br />$0 <br />33A - Utilities <br />($3,500) <br />$0 <br />($3,500) <br />41A - Overhead Crane System <br />$0 <br />$0 <br />$0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.