Laserfiche WebLink
P.W. CASE <br /> <br />REQUEST FOR CHANGE ORDER TO IMPROVEMENT PROJECT 00-35, 141st <br />AVENUE NW STREET AND UTILITY CONSTRUCTION <br /> By: Brian E. Olson, City Engineer <br /> <br />Background: <br /> <br />As you may recall the extension of 141st Avenue NW was discussed last February at the Public <br />Works Committee meeting and it was decided to stop the construction of 141st Avenue NW at <br />the western edge of the property owned by St. Paul terminals. Staff was also authorized to install <br />water main on the north side of the existing St. Paul Terminals property, repave the area that we <br />disturb, and place barricades on the southern half of 141st Avenue NW. <br /> <br />St. Paul Terminals have agreed to give the City the necessary easement to construct a wider road <br />(see attachments), abandon their own well (which would be on the property that they give us), <br />and hook up to the City water supply at their own cost if the City of Ramsey waives the water <br />trunk and lateral charges. <br /> <br />The Change Order would be estimated as follows: <br /> <br />220 L.F. Concrete C&G = $3,500 <br />330 C.Y. Excavation = $ 700 <br />Class 5 Aggregate Base = $ 500 <br />Binder Course = $ 700 <br />Wear Course = $ 600 <br />Total $6,000 <br /> <br />Recommendation: <br /> <br />It is staff's recommendation to enter into a Change Order to authorize Erickson Construction to <br />install approximately 220 feet of concrete curb and gutter to more clearly delineate the shift of <br />traffic and to waive the water connection charges associated with Lot 1 of the St~ Paul Terminals <br />property. <br /> <br />Council Action: <br /> <br />Motion to enter into a Change Order to authorize Erickson Construction to install approximately <br />220 feet of concrete curb and gutter to more clearly delineate the shift of traffic and to waive the <br />water connection charges associated with Lot 1 of the St. Paul Terminals property. <br /> <br />Reviewed by: <br />City Administrator <br />Director of Public Works <br />Finance Officer <br /> <br />FC: 07/16/01 <br /> <br /> <br />