My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/15/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 09/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:29:20 AM
Creation date
9/10/2020 4:25:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/15/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oakwood shall receive one hundred percent (100%) of the Water Trunk Fee for each of <br />the 2,390 lots even if the Water Trunk Fee at the time is in excess of the current One Thousand <br />Nine Hundred Twenty-five and 00/100ths Dollars ($1,925.00) per lot. <br />If Oakwood is unable to receive preliminary plat approval from the City for the full <br />number of Oakwood Lots then the Additional Oakwood Reimbursement will be increased by <br />increasing the number of lots available for reimbursement within the Northwest Service Area, <br />the Northeast Service Area and the Additional Oakwood Reimbursement Area. The increase in <br />lots shall be based on the number of Oakwood Lots that Oakwood does not develop. For <br />example, if Oakwood only develops 400 lots, then the number of lots that Oakwood shall <br />receive 100% of the Water Trunk Fees shall be increased by 57 lots [calculated as follows: 457 <br />Oakwood Lots anticipated to be developed — 400 Oakwood Lots actually developed]. <br />It is agreed that Oakwood will not receive a proportion of any Water Trunk Fee if the <br />City does not receive a Water Trunk Fee as a result of an agreement with any other developer <br />that provides for the developer to pay the cost of the extension of the water main to such <br />developer's property which is considered a payment of the Water Trunk Fees for the lots to be <br />developed by such developer. <br />3.04 Additional Oakwood Lots. If Oakwood develops any lots in addition to the <br />Oakwood Lots within the Northwest Service Area, Northeast Service Area and/or the Additional <br />Oakwood Reimbursement Area, Oakwood shall not be required to pay any Water Trunk Fees for <br />such additional lots, and the then current City Trunk Fees shall be credited against the balance of <br />the Additional Oakwood Reimbursement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.