My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/15/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 09/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:29:20 AM
Creation date
9/10/2020 4:25:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/15/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. DEFINITION OF TERMS — Capitalized terms as used herein shall have the definition attributed to <br />them herein, Capitalized terms used herein that do not have a stated definition herein shall have that <br />definition assigned to them in the WSCA. <br />3. AMENDMENTS TO WSCA <br />A. Article 3 of the WSCA is hereby deleted, and replaced by the following Article 3: <br />ARTICLE 3 <br />21st REIMBURSEMENT <br />3.01 .21st Reimbursement The parties acknowledge that as of the date hereof, the City has partially <br />reimbursed Oakwood for the Oakwood Contribution in the total amount of $ 502,204.00, through credits <br />given in the respective Brookfield development agreements. In addition, Oakwood assigned some <br />credits to Sweetbay Land Company, a Minnesota corporation, and an Oakwood related company. <br />Sweetbay Land Company was given Trunk Fee credit for $208,216.00 in the Sweetbay Ridge/City of <br />Ramsey development agreement for Sweetbay Ridge Addition. The total amount reimbursed for the <br />Oakwood Contribution to date is therefore $710,420.00. The amount remaining to be reimbursed to <br />Oakwood is therefore $5,289,580.00. Oakwood has assigned its rights to the Oakwood Lots <br />Reimbursement to 21 st <br />Future lots platted from outlots or other lots in Brookfield First, Second and or Third Addition <br />will pay no Trunk Fees for each lot platted, the amount of the Oakwood Contribution deemed reduced <br />by the Trunk Fee credit will be $3,062 per lot ($1,925 for the Water Trunk Fee and $1,137,00 for sewer <br />Trunk Fee). In addition, 21st is entitled to up to 91 additional water Trunk Fee credits from the current <br />unplatted lots in Sweetbay Ridge, and up to 60 additional water Trunk Fee credits from the current <br />unplatted lots in Harmony Farms, pursuant to Section 3,01 of the WSCA. The City shall charge the <br />ultimate developer of the remaining unplatted lands in Sweetbay Ridge (91 lots) and Harmony Farms <br />(60 lots) the full Trunk Fees, and remit the Water Trunk Fees to 21st at the address noted in Article 5 <br />Section 07 in satisfaction of the credits owed to 21st for those two developments. The City will retain <br />the sanitary sewer trunk fees for said lots, Except for the remaining unplatted area of Brookfield (as <br />represented by platted developable outlots), City will also retain the right to all future sanity sewer trunk <br />fees of any kind or nature, <br />3.02 Additional 21st Reimbursement For each lot (new or existing) connected to city water within the <br />Northwest Service Area, Northeast Service Area (outside of Brookfield or parts thereof,) or within the <br />Additional Oakwood Reimbursement Area, and outside of Sweetbay Ridge and Harmony Farms, 21s' <br />will receive from the City the Water Trunk Fee, payable at the time the hookup of a lot occurs, and in <br />the manner provided by Article 5, Section 5,01. If the City increases the Water Trunk Fee, then this <br />per/lot amount will increase by a like amount. The Water Trunk Fee reimbursement will continue until <br />the total amount of the Oakwood Contribution credited by City to date ($710,420.00) plus the total <br />amount received or credited or paid from new lots created from outlots or other lots in Brookfield or <br />current unplatted lots in Sweetbay Ridge or Harmony Farms plus the total amount received from all <br />other lots platted or hooking up to city water in the Northwest, Northeast Service Areaand the <br />Additional Oakwood Reimbursement Area ($1,925,00 per hookup -or as increased) totals six million <br />dollars ($6,000,000.00), or until December 31, 2026, whichever comes first, <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.