My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/15/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 09/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:29:20 AM
Creation date
9/10/2020 4:25:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/15/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 6. 1. <br />Meeting Date: 09/15/2020 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Receive Staff Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />• The COR Regional Infiltration Basin (#18-09) <br />• Change Orders are still being evaluated to address excess topsoil removal / backfill and muskrat <br />protection improvements <br />• LRRWMO Permit expires September 30, 2020 <br />• All improvements are operating as planned <br />• Punch list work is underway and final payment anticipated October 2020 <br />• Ford Brook Estates Street Reconstructions (#19-01) <br />• Punch list work is underway and final payment anticipated October 2020 <br />• Wood Pond Hills and Chestnut Ridge Street Reconstructions (#19-03) <br />• Punch list work is underway and final payment anticipated September 2020 <br />• RTC 9th Addition Pond Lining Improvements (#19-06) <br />• Final payment anticipated September 2020 <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />• Work requested by DNR <br />• Construction proposed for 2021 <br />• Hedgehog Street Drainage Improvements (#19-10) <br />• Final payment anticipated September 2020 <br />• Variolite Street Reconstruction (#20-01) <br />• Dewatering and sanitary sewer construction will be completed next week <br />• Watermain construction nearly complete <br />• Pavement reclamation of entire corridor will begin next week <br />• Municipal Plaza Park Fill (#20-10) <br />• Work is complete and final payment anticipated September 2020 <br />• Sand volume = 8,944 cubic yards; EDA to fund 944 CY ($4,663.36) <br />• Reclamite Pavement Rejuvenator Pilot Project (NEW) <br />• Alternate to sealcoat improvements <br />• Pilot project completed on Ute St. (Alpine Dr. - 154th Ln.) on 7/16/20 <br />• Staff continues to evaluate performance and is considering 2021 project <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Anoka County and City of Ramsey share is $150,000 each (per $1.5M est.) <br />• Construction proposed for 2022, pending City and County approvals <br />• CSAH 116 & TH 47 Intersection Improvements <br />• Constructing additional turn lanes to improve congestion and safety in 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.