Laserfiche WebLink
Contractors for Capital Improvement projects should be required to fill their water trucks <br />from designated hydrants and that the area is flushed prior to construction activity taking <br />place. <br /> <br />In general, flow velocity forfire training is high and we should try to flush the area prior <br />to scheduled training activities. <br /> <br />Initiate a Customer Complaint Tracking system. This will identify the locations of the <br />complaints we receive and action that was needed to correct the situation. <br /> <br />Committee Action: <br /> <br />Based upon discussion <br /> <br />Reviewed by: <br />City Administrator <br />Director of Public Works <br /> <br />PW: 11/20/01 <br /> <br /> <br />