My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/22/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 09/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:07:00 PM
Creation date
10/7/2020 4:16:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5, 7, <br />Meeting Date: 09/22/2020 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title <br />Adopt Resolution #20-144 Approving Change Order #1 for The COR Infiltration Basin, Improvement Project <br />#18-09 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #20-144 approving Change Order #1 for The COR Infiltration Basin <br />Improvements, Improvement Project #18-09. <br />Background: <br />The purpose of Change Order #1 in the amount of $1,500 is to allow the contractor for The COR Infiltration Basin, <br />Northern Lines Contracting, Inc., to install muskrat protection shielding on the lift station float lines since muskrats <br />sometimes enter stormwater lift stations and damage float lines by chewing on them, which the approved plans and <br />specifications did not account for. <br />If this shielding is not installed and muskrats enter the lift station and damage the float lines by chewing on them it <br />will cost significantly more than $1,500 to repair the lines. In addition, if the float lines are damaged the lift station <br />could be rendered inoperable for a period of time. <br />A copy of Change Order #1 is attached including the Contractor's and the City Engineer's signatures. <br />The work covered by this Change Order has not been completed. No extension of time is approved as part of <br />Change Order #1. <br />Payment for work covered by Change Order #1 will be paid with stormwater utility funds, similar to the rest of the <br />work completed with this project. <br />Recommendation: <br />Staff recommends adopting Resolution #20-144 approving Change Order #1 for The COR Infiltration Basin <br />Improvements, Improvement Project #18-09. <br />Action: <br />Adopt Resolution #20-144 approving Change Order #1 for The COR Infiltration Basin Improvements, Improvement <br />Project #18-09. <br />Resolution #20-144 <br />IP 1809 Change Order 1 <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.