Laserfiche WebLink
conflicts with the gas mains. Northern Natural Gas approved the plans prepared by Staff with some contingencies, <br />which have been built into the plans. <br />When meeting with the property owner on February 13, 2020, the owner requested that the City pay to repair their <br />damaged patio, which they claim occurred as a result of stormwater runoff flowing through the swale. On May 4, <br />2020, a claim was filed by the City with the League of Minnesota Cites Insurance Trust. It is Staffs understanding <br />that LMCIT has since denied the property owner's claim, and that the property owner is appealing their decision. <br />These drainage improvements are proposed to be completed in 2020 to help avoid future damage claims by the <br />property owner. <br />Staff estimated construction costs for this project at $22,000 based on the attached plans. On August 25, 2020, the <br />City Council authorized Staff to solicit quotes for this work. Staff submitted Requests for Quotes to three local <br />contractors. Two of the contractors indicated they were too busy to complete the work this year. Only one <br />contractor, Dryden Excavating, Inc., submitted a quote, which was in the amount of $22,827.78. Staff believes this <br />is a reasonable quote and recommends that the City accept it and construct the improvements in 2020. <br />City Staff will administer and inspect construction of these improvements. <br />Construction staking is proposed to be provided by Bolton & Menk at a cost not -to -exceed $1,000. <br />Project costs are proposed to be funded using a combination of Stormwater Management and Stormwater Utility <br />Funds. <br />Once the contractor begins work, the improvements are anticipated to take 5 to 10 days to complete, with <br />completion specified by October 23, 2020. Final payment will be issued in 2021 after turf is established and all <br />work is approved. <br />Recommendation: <br />Staff Recommendations <br />Staff recommends adopting Resolution #20-214 accepting the quote of and awarding a construction contract to <br />Dryden Excavating, Inc. in the amount of $22,827.78 for 5751 164th Lane Drainage Improvements, Improvement <br />Project # 19-17, and authorizing Bolton & Menk to stake construction at a cost not -to -exceed $1,000. <br />Public Works Committee Recommendations <br />On August 18, 2020, the Public Works Committee unanimously recommended City Council authorization to solicit <br />Requests for Quotes for 5751 164th Lane Drainage Improvements, Improvement Project #19-17. <br />The Committee also asked if Staff had explored the option of grading a berm between the front yard and the back of <br />the drainage ditch at 5751 164th Lane to prevent stormwater runoff from leaving the ditch and draining across this <br />property via the swale. Staff indicated they did not believe such work could be completed within the existing <br />right-of-way and drainage easement, but that they would review this option and report their findings back to the <br />Committee on September 15th. Below is a summary of the design options Staff explored, including Staff's findings <br />and recommendations for each. <br />Option 1: <br />Grade a berm north of 164th Lane at back edge of drainage ditch <br />This option, which was explored at the request of the Public Works Committee, involves construction an earth berm <br />at the back edge of the drainage ditch within City right-of-way (ROW) between the driveway and the high point in <br />the ditch to the west. The controlling factors are the high point in the ditch approximately 40 feet west (875.1) and <br />the edge of the driveway 25 feet to the east (875.6). The berm would be built with a top elevation of (875.1). The <br />existing culverts under 164th Lane and the driveway at 5751 164th Lane are slightly buried with flow -line <br />elevations around 874.2. <br />Findings/Recommendations - In heavy storm events, an area of the ditch approximately 65-feet by 15-feet would <br />