Laserfiche WebLink
20-08 9591 Inverness Lane Drainage Improvements <br />Quote Form <br />Item MnDOT Estimated <br />No. No. Item Unit Quantity Unit Cost Cost Extension <br />1 2021.501 Mobilization LS 1 <br />2 2101.524 Clearing & Grubbing TREE 1 <br />3 2104.502 Remove Bituminous Flume EA 2 <br />4 2104.502 Remove Pipe Apron EA 2 <br />5 2104.503 Sawing Bituminous Pavement LF 88 <br />6 2104.503 Remove Concrete Curb & Gutter LF 21 <br />7 2104.503 Remove Sewer Pipe (Storm) LF 99 <br />8 2104.504 Remove Bituminous Pavement SY 105 <br />9 2105.504 Geotextile Fabric Type IV SY 26 <br />10 2105.507 Common Excavation (EV) CY 200 <br />11 2112.519 Subgrade Preparation RDST 1 <br />12 2211.507 Aggregate Base (CV); Class 5 Mod CY 15 <br />13 2232.504 Mill Bituminous Surface (2.0") SY 20 <br />14 2357.506 Bituminous Material for Tack Coat GAL 7 <br />Type SP 9.5 Wearing Course <br />15 2360.509 Mixture (1.5") TON 8 <br />Type SP 12.5 Non Wearing Course <br />16 2360.509 Mixture (2.0") TON 11 <br />17 2501.502 18" CS Pipe Apron EA 2 <br />18 2501.602 Safety Grate for 18" CS Pipe Apron EA 2 <br />19 2503.503 18" RC Pipe Sewer Design 3006 LF 30 <br />20 2503.503 18" HDPE Pipe Sewer LF 364 <br />21 2504.601 Irrigation System Repair LS 1 <br />