My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/22/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 09/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:07:00 PM
Creation date
10/7/2020 4:16:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />August 31, 2020 <br />Joe Feriancek, P.E. <br />Civil Engineer II <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />RE: Proposal for Construction Staking Services <br />9591 Inverness Lane Drainage Improvements (CP No. 20-08) <br />Dear Joe: <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />We appreciate the opportunity to assist the City of Ramsey with the construction staking for the above <br />referenced project. We have reviewed the August 21, 2020 plans for the project and developed our <br />scope and fee based on that document. <br />SCOPE OF WORK <br />Bolton & Menk will complete the following survey related tasks associated with the project: <br />• Establish Horizontal and Vertical Control; <br />• Create Stakeout Files; <br />• Stake Grading; <br />• Stake Storm Sewer; and <br />• Stake Curb and Gutter; <br />ASSUMPTIONS <br />We have made the following assumptions in preparing this proposal: <br />• Data will be provided to us electronically (AutoCAD files). <br />• No allowance is included for attending the precon meeting or staking removals or right-of-way. <br />• No allowance is included for taking asbuilt measurements. <br />• Replacing damaged or removed stakes is not included in our base fee. <br />• No additional fees for stakes, mileage, equipment, etc. will be invoiced to the City, but are <br />included in our hourly rates. <br />• Additional services, if required, will be performed at the rates presented in the Proposed Fees <br />section of this proposal. <br />C:\Users\kevinki\Desktop\Ramsey 2020 Construction Staking\RAMS - CIP 20-08 9591 Inverness Lane - Staking Proposal .docx <br />Bolton 8 Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.