My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/22/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 09/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:07:00 PM
Creation date
10/7/2020 4:16:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nowthen Boulevard to westbound on 146th Avenue. As part of the Final Plat submittal, the Applicant has included <br />construction plans for this turn lane and has also submitted those plans to Anoka County for review. While this <br />project may contribute to increased traffic at this intersection, both the Planning Commission and the City Council <br />acknowledged that this is an existing issue and that the Applicant should not be solely responsible for the safety <br />improvements. <br />Staff has suggested a thirty percent (30%) contribution by the City to this safety improvement. The Applicant has <br />stated that the incorporation of a turn lane on Nowthen Boulevard was an unanticipated requirement of the project <br />and that the added cost (per the submitted Engineer's Estimate, approximately $194,000) is not financially feasible. <br />Even with a 30% contribution from the City, the remaining balance would still be almost $134,000. Please note that <br />this is an Engineer's Estimate at this time, and Staff is hopeful that bids come in lower than that amount. The <br />Developer has been encouraged to obtain actual bids for analysis. Staff is open to a higher contribution, but would <br />recommend not to exceed 50% of the cost unless a broader corridor study is completed. <br />The Final Plat submittal appears to have addressed the contingencies outlined in the approval of the Preliminary <br />Plat (Applicant is still working through plan revisions per the review comments). <br />Alternatives <br />Alternative 1: Approve the Final Plat and Development Agreement, including a 30% city contribution to the cost of <br />the turn lane on Nowthen Boulevard (not to exceed $58,096.00, based on the Engineer's Estimate). <br />Alternative 2: Approve the Final Plat and Development Agreement, including a modified cost share contribution by <br />the City to the cost of the turn lane on Nowthen Boulevard. <br />Alternative 3 : Do not approve the Final Plat. <br />Funding Source: <br />All costs associated with this request are the Applicant's responsibility. However, if the project is approved with a <br />City contribution to the turn lane, that cost would be from the PIR Fund. <br />Recommendation: <br />The Planning Commission recommended approval of this project and the City Council approved the Preliminary <br />Plat for this project (the contingencies of that approval have been addressed). This is the final step in the platting <br />process. <br />Action: <br />Motion to adopt Resolution #20-205 approving the Final Plat and Development Agreement for Hampton <br />Townhomes. <br />Attachments <br />Site Location Map <br />Final Plat <br />Color Rendering of Buildings <br />Noise Study <br />City Council Meeting Minutes Dated June 23, 2020 <br />Draft Development Agreement <br />Resolution #20-205 <br />Form Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.